2. General<br />
2.1 Application / Installation<br />
The Aqualift F Pumpstation is designed to automatically pump<br />
wastewater (with or without sewage collected below the outgoing<br />
sewer level) according to the requirement of DIN 1986<br />
into a septic system or public sewer piping. This system is only<br />
for use with wastewater draining from single and multi-family<br />
homes, commercial buildings, hotels, restaurants, hospitals,<br />
schools or similar buildings. In circumstances where the interruption<br />
of wastewater flow is not allowed or desired, a twin<br />
pump system (Pumpstation Aqualift F Duo) is required in which<br />
the second pump will activate during times of heavy flow or if<br />
the second pump is not operating for any reason.<br />
The KESSEL Pumpstation Aqualift F is designed for outdoor /<br />
underground installation. Pumps are equipped with macerating<br />
blades which cut all soft objects into smaller pumpable pieces.<br />
Due to the cutting blades, outlet pipes of DN 40 or larger may<br />
be connected to the outlet of the Pumpstation<br />
Aqualift F. Objects in the wastewater which could damage or<br />
cause wear and tear on the cutting / macerating blades should<br />
not come in contact with the pumps. The system is designed<br />
to handle continuous wastewater temperatures up to 40 deg C<br />
(104 deg F).<br />
The KESSEL Aqualift F Pumpstation is delivered in the following<br />
variations:<br />
• As a mono unit with a single pump or as a duo unit with twin<br />
pumps<br />
• With pumps with various strengths (kW)<br />
• In a KESSEL Inspection Chamber with an internal width of<br />
800mm or 1000mm<br />
• With installation depths from 1.5 to 5.0 meters<br />
The pump base, gate closure valves, non-return flaps, pressure<br />
pipe connection and float switches have already been<br />
installed in the chamber base. The pumps, the additional inspection<br />
chamber sections and the control unit are delivered<br />
not installed in the system. Depending on the size of the<br />
pumps, the pumps are either delivered inside the chamber’s<br />
upper section or on a separate pallet. The pumps should be<br />
installed in the chamber only after the chamber has been<br />
completely installed.<br />
EX<br />
In order allow any collecting explosive gases<br />
to disperse, adequate ventilation is required.<br />
2.2 Aqualift F description<br />
The KESSEL Aqualift F pumpstation consists of the following:<br />
1. Single (1 pump) or Twin (2 pumps)<br />
2. In KESSEL 800 or 1000mm diameter Inspection Chamber<br />
3. Pump support base<br />
4. Closure valve for each pump<br />
5. Backflow flap<br />
6. PEHD PN 10 pressure outlet in size DN 50 (OD 63mm)<br />
and DN 80 (OD 90mm)<br />
7. DN 100 ventilation connection<br />
8. DN 100 cable connection<br />
9. DN 100 / DN 150 inlet<br />
10. Float switches<br />
11. Control unit (see illustration in Chapter 8)<br />
8<br />
7<br />
9<br />
2<br />
4<br />
6<br />
5<br />
1<br />
3<br />
10<br />
Illustration shows KESSEL Pumpstation Aqualift F<br />
twin pumping unit<br />
42