04.03.2013 Views

install–38 - Ibm

install–38 - Ibm

install–38 - Ibm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

77<br />

Figure 14. Rail adjustment screws<br />

Setting server ID settings<br />

8. Remove the white screws and nuts ▌1▐ from the storage server bezel; then slide<br />

the storage server into the rack. Align the bezel locator pins and attach the<br />

bezel with two M6 screws ▌2▐; then install and tighten the 6-32 in. screws ▌3▐.<br />

88<br />

Figure 15. Server installation<br />

9. Reverse step 1 through step 4 to reinstall the components that you removed.<br />

See your storage server documentation to complete your installation. Store this<br />

information with the storage server documentation for future use.<br />

The FAStT600 comes with a server ID switch that is used to identify the FAStT600<br />

on a fibre-channel loop. The server ID switch is located on the back of the unit, as<br />

shown in Figure 16 on page 17.<br />

16 IBM TotalStorage FAStT600 Fibre Channel Storage Server: Installation and User’s Guide

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!