04.03.2013 Views

install–38 - Ibm

install–38 - Ibm

install–38 - Ibm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. Carefully flip over the RAID controller bottom panel. Disconnect the battery<br />

harness on the battery from the two-pin connector on the controller board as<br />

shown in Figure 54 on page 63.<br />

12. Remove the screw that holds the battery access panel. Carefully slide the<br />

access panel toward the front to unlatch it from the three pins mounted on the<br />

RAID controller bottom panel.<br />

13. Remove the battery unit and place it on a dry, level surface. If this battery is a<br />

replacement battery, then replace the old battery with the new one.<br />

14. Write the battery replacement information on the label on the battery pack.<br />

v Installed date – Write today’s date<br />

v Replacement Date – Write the date three years from today’s date<br />

Note: The preferred method of checking for the battery operating age is<br />

through the storage server management software.<br />

Pb<br />

CONTAINS<br />

SEALED LEAD<br />

BATTERY.<br />

BATTERY<br />

MUST BE<br />

RECYCLED.<br />

CAUTION:<br />

Use proper facilities to recycle the used battery CRU. If the battery CRU<br />

is physically damaged or leaking electrolyte gel, do not ship it to a<br />

recycling center. The battery contains sealed lead-acid batteries that<br />

might be considered hazardous material. You must handle this unit in<br />

accordance with all applicable local and federal regulations.<br />

15. Position the replacement battery inside the RAID controller.<br />

16. Reassemble the battery access panel to the RAID controller bottom panel by<br />

aligning it with the three pins on the RAID controller bottom panel. Slide the<br />

battery access panel toward the back until you can insert the screw that holds<br />

the battery access panel to the RAID controller bottom panel. If this battery is<br />

a replacement battery, then you must reconnect the battery harness to the<br />

two-pin connector on the controller board.<br />

Note: The connector is keyed so that there is only one way to attach the<br />

hardness to the connector. Do not force fit.<br />

17. Flip the RAID controller bottom panel over and carefully place it on the<br />

controller sides. Push the RAID controller bottom panel toward the front to<br />

latch it to the side panels. If the controller bottom panel is placed correctly, you<br />

should be able to access the mounting holes for the six screws that you<br />

removed in step 6 on page 62. Reinsert the six screws. Do not overtighten.<br />

18. Dispose of the used battery CRU according to local and federal regulations,<br />

which might include hazardous material handling procedures.<br />

In the United States, IBM has established a collection process for reuse,<br />

recycling, or proper disposal of used IBM sealed lead acid batteries. For<br />

information on proper disposal of these batteries, please contact your IBM<br />

representative. For information on disposal of sealed lead acid batteries<br />

outside the United States, contact your local waste disposal facility.<br />

66 IBM TotalStorage FAStT600 Fibre Channel Storage Server: Installation and User’s Guide

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!