04.03.2013 Views

install–38 - Ibm

install–38 - Ibm

install–38 - Ibm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lever<br />

AC power<br />

connector<br />

Fault LED Fault LED<br />

Strainrelief<br />

clamp<br />

AC power<br />

switch<br />

AC power<br />

connector<br />

AC power<br />

Strain- switch<br />

relief clamp<br />

Levers<br />

Use these locking handles to remove or install a power supply.<br />

Power LED<br />

These green LEDs light when the storage server is turned on and receiving<br />

ac power.<br />

Fault LEDs<br />

These amber LEDs light if a power supply failure occurs or if the power<br />

supply is turned off.<br />

AC power switches<br />

Use these switches to turn the power supplies on and off. You must turn on<br />

both switches to take advantage of the redundant power supplies.<br />

AC power connectors<br />

This connection is for the ac power cord.<br />

Strain-relief clamp<br />

Use this clamp to provide strain relief on the power cord.<br />

Removing a hot-swap power supply<br />

Statement 8<br />

Power LED<br />

Figure 44. Power supply controls<br />

Hot-swap power<br />

supplies<br />

Lever<br />

56 IBM TotalStorage FAStT600 Fibre Channel Storage Server: Installation and User’s Guide<br />

Power LED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!