SonTek/YSI Argonaut-XR Technical Manual - HydroScientific West
SonTek/YSI Argonaut-XR Technical Manual - HydroScientific West
SonTek/YSI Argonaut-XR Technical Manual - HydroScientific West
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
?<br />
?EXIT! command, 24<br />
+<br />
+++ (alternative BREAK) command, 31<br />
A<br />
A (AvgInterval time left) command, 33<br />
access to electronics, 55<br />
alternative BREAK (+++) command, 31<br />
analog board, 51<br />
analog output option, SL/<strong>XR</strong>, 113<br />
AnalogOutputType (AOT) command, 113<br />
AO converter, 113<br />
ARGONAUT.EXE, 5<br />
ASCII output data format, 35<br />
autonomous deployment. See deployments,<br />
autonomous<br />
AutoSleep (AS) command, 16<br />
averaging interval, 2<br />
AvgInterval (AI) command, 18, 23<br />
B<br />
battery housing, external, 65<br />
battery pack replacement, 58<br />
battery power, 1<br />
baud rate setting, 53<br />
beam coordinate system, 67<br />
beam geometry, 47<br />
binary data file format, 87<br />
biofouling, 70, 73<br />
BlankDistance (BD) command, 20<br />
board locations<br />
<strong>Argonaut</strong> MD, 48<br />
<strong>Argonaut</strong> SL, 49<br />
<strong>Argonaut</strong> <strong>XR</strong>, 49<br />
BoardRev command, 16<br />
boundary adjustment, dynamic, 2<br />
BREAK, 2<br />
alternative (+++), 31<br />
definition, 10<br />
bulkhead connector, 53<br />
burst interval, 3<br />
Index<br />
<strong>Argonaut</strong> Operation <strong>Manual</strong> Firmware Version 7.9 (May 1, 2001)<br />
burst sampling, 2, 3<br />
BurstInterval (BI) command, 23<br />
BurstMode (BM) command, 23<br />
C<br />
<strong>SonTek</strong>/<strong>YSI</strong><br />
C (clock adjust) command, 32<br />
cables<br />
and connectors, 53<br />
maintenance, 70<br />
power/communications, 1, 96<br />
splitter, 1<br />
calibration, compass, 44<br />
Cartesian (XYZ) coordinate system, 67<br />
CD (current deployment) command, 25<br />
cell begin, 2<br />
cell end, 2<br />
CellBegin (CB) command, 19<br />
CellEnd (CE) command, 20<br />
CellSize (CS) command, 20<br />
checksum calculation, 91<br />
chip replacement, 57<br />
cleaning transducers, 70<br />
clock adjust (C) command, 32<br />
command syntax, 10<br />
commands, system, 15<br />
Comments command, 22<br />
communication protocol considerations, 67<br />
communication protocols and settings, 7<br />
communication/power cable, 53<br />
compass<br />
calibration, 44<br />
commands, 28<br />
communication, 45<br />
installation, 40<br />
operation, 39<br />
testing, 39<br />
Compass CAL command, 28<br />
Compass command, 28<br />
compass/tilt sensor, 1<br />
components, 1<br />
condensation, 70<br />
configuration settings, hardware, 47<br />
connectors. See cables and connectors<br />
contact information, 85<br />
continuous sampling, 3<br />
119