Nature and Magnitude of Construction Impacts<br />

6.269 From this viewpoint neither the construction compound nor the works at<br />

ground level would be visible during the construction phase. The only<br />

additional impact over and above those assessed as permanent under the<br />

heading of Operational Phase below. would be a minor view of the cranes<br />

erecting the turbines but this would be <strong>for</strong> a relatively short time period.<br />

The cranes would be barely perceptible in the context of the site being<br />

constructed. There<strong>for</strong>e there would be no additional impact on the view<br />

during construction.<br />

Significance of Construction Effects on View<br />

6.270 There would be no additional effect on the viewpoint during construction<br />

over and above those assessed as permanent under the heading of<br />

Operational Phase below.<br />

Nature and Magnitude of Operational Impacts<br />

6.271 From the western edge of Ulley Reservoir as represented by the<br />

photomontage in Figure 6.10, the rotating blade tips of all six turbines<br />

would be visible in an easterly direction. However, the turbines would be<br />

mainly screened by land<strong>for</strong>m which rises steeply at the eastern end of the<br />

reservoir and vegetation in the intervening landscape. There<strong>for</strong>e the hubs<br />

of only two turbines would be visible, namely the southernmost turbine and<br />

the third from southernmost turbine.<br />

6.272 It should be noted that views of the development as discussed above<br />

would only be possible from a relatively small part of Ulley Country Park,<br />

primarily from the point at which the footpath around the reservoir crosses<br />

over a dam on the north western edge of the reservoir and the western<br />

part of the reservoir itself.<br />

6.273 From the majority of the length of the paths around the reservoir there<br />

would be no view of the turbines. Notably there would be no views of the<br />

development from the path around the northern arm of the reservoir and<br />

no views from the southern path between the visitor centre and Ulley<br />

Lane.<br />

6.274 From the visitor centre and the main car park, there would be no view of<br />

the turbines due to vegetation along the south western edge of the<br />

reservoir which restricts views across the water.<br />

6.275 Where visible along the western edge of the reservoir, the blades of the<br />

nearest turbine would be approximately 2120m away. The very top of the<br />

meteorological mast would also be visible but the rising land<strong>for</strong>m and<br />

vegetation between the site and the Country Park would obstruct any view<br />

of the access tracks, control building or the substation.<br />

100<br />