13. GROUND CONDITIONS AND<br />

HYDROLOGY<br />

INTRODUCTION<br />

13.1 This section summarises the results of a desk study and walkover survey<br />

of the study area, including the application site and immediate<br />

surroundings. The study area covered in this assessment is<br />

approximately 170 hectares. This section also details the results of a<br />

Flood Risk Assessment (FRA) undertaken by S M Foster Associates Ltd<br />

<strong>for</strong> the proposed development. The FRA was undertaken in response to a<br />

request from the Environment Agency as part of the EIA Scoping Opinion.<br />

The full FRA report is included in Appendix 9.<br />

13.2 The purpose of the assessment was to identify topographical, geological<br />

and hydrological constraints to the development of wind turbines within the<br />

study area. The main output of the study identified areas where turbine<br />

locations could be constrained due to geological faults, areas of potential<br />

collapse/subsidence and flooding. Such areas were mapped with other<br />

potential constraints at the site to ensure that no turbines or other site<br />

infrastructure were located within them.<br />

13.3 Drawing HJB/681/PA17 (Sheets 1 and 2) shows the ground conditions and<br />

related constraints within the study area and features relating to geology<br />

and hydrology.<br />

METHODOLOGY<br />

13.4 The primary sources of in<strong>for</strong>mation reviewed as part of the ground<br />

conditions study have included:<br />

In<strong>for</strong>mation from Ordnance Survey (OS) plans;<br />

Geological in<strong>for</strong>mation including British Geological Survey Sheets<br />

295NE, 295SE, 296NW and 296SW at 1:10560 scale; and<br />

A British Geological Survey (BGS) detailed geological assessment<br />

report (dated July 2008). This report is included in Appendix 9.<br />

13.5 The FRA was prepared in accordance with the requirements of “Planning<br />

Policy Statement 25 - Development and Flood Risk”. As the site is situated<br />

in Flood Zone 1 the FRA is primarily focused on assessment of surface<br />

water management requirements and measures required to ensure that<br />

the proposed development does not result in increased flood risk in the<br />

surrounding area.<br />

281<br />

Penny Hill Wind Farm<br />

Environmental Statement