case” scenario it has been assumed that 100 percent of vehicles<br />

accessing the site would utilise the M1 and the A57.<br />

11.37 This transport assessment there<strong>for</strong>e considers increases in traffic on the<br />

M1 at its junction with the A57 (Junction 31) and the southbound M18 at its<br />

junction with the A631 (Junction 1). The assessment also considers<br />

increases in traffic westbound on the A631, southbound on the B6060 and<br />

westbound on Hawk Hill Lane near to the proposed site access <strong>for</strong> the<br />

transportation of turbine components and eastbound on the A57,<br />

northbound on the B6463 and Common Road and westbound on Penny<br />

Hill Lane <strong>for</strong> all other construction traffic.<br />

Table 11.2: Predicted Bidirectional Monthly Movements during Construction Phase:<br />

All Vehicles<br />

Activity<br />

257<br />

Month<br />

1 2 3 4 5 6 7 8 9 10 Total<br />

Heavy Goods Vehicle Movements (HGV) including Abnormal Loads (ALV)<br />

Mobilisation to site 72 20 92<br />

Access tracks and<br />

crane pads<br />

560 560 560 560 2240<br />

Turbine foundations 190 190 190 190 760<br />

Metering building 30 30 60<br />

Electrical<br />

installation<br />

20 20 20 60<br />

Turbine<br />

trans<strong>for</strong>mers<br />

6 6 12<br />

Turbine & crane<br />

deliveries<br />

2 32 68 68 22 190<br />

Demobilisation and<br />

site clearance<br />

60 32 92<br />

Monthly Totals 632 580 782 800 216 248 68 68 82 32 3508<br />

Light Vehicle (LV) Movements (cars, minibuses and small vans)<br />

All light vehicles 440 660 880 880 880 880 660 660 660 660 7260<br />

All Vehicle Movements<br />

Monthly totals 1072 1240 1661 1680 1096 1127 728 728 742 692 10768<br />

Average Daily<br />

Movements (5-day<br />

working week)<br />

Average Daily HGV<br />

Movements (5-day<br />

working week)<br />

Average Hourly<br />

Movements (10-<br />

hour working day)<br />

Average Hourly<br />

HGV Movements<br />

(10-hour working<br />

day)<br />

49 56 76 76 50 51 33 33 34 31<br />

29 26 36 36 10 11 3 3 4 1<br />

5 6 8 8 5 5 3 3 3 3<br />

3 3 4 4 1 1 1 1 1 1<br />