Impact on<br />
Landscape<br />
Impact on TV<br />
Reception<br />
Impact to Wildlife<br />
on or Around the<br />
Site<br />
Concern that the<br />
Proposals are too<br />
Close to Housing<br />
Concern About<br />
Construction<br />
Traffic Using<br />
Local Roads<br />
Does Not Comply<br />
with Existing<br />
Greenbelt Policy<br />
Noise – Low<br />
Frequency<br />
Wind Turbines<br />
Not Effective /<br />
Don‟t Produce<br />
Any Power<br />
Concerns About<br />
Grid Connection<br />
The landscape character and the potential impact of the<br />
development on it will be assessed as part of the landscape and<br />
visual impact assessment.<br />
An assessment of this will be included in the application. Should<br />
interference occur, there are options to provide alternative services<br />
to affected residents. A TV reception survey will be carried out<br />
be<strong>for</strong>e the wind farm becomes operational that can be used to<br />
monitor any effects. The Applicant will commit to rectifying any<br />
reception problems caused by the wind turbines at our expense.<br />
Ecological and Ornithological studies are being completed on the<br />
site to establish the presence of various <strong>for</strong>ms of habitats and<br />
wildlife. The details will be contained in the Environmental<br />
Statement.<br />
No turbines are to be located closer than 500m from any groups of<br />
residential property.<br />
[It is assumed that these broad comments relate mostly to<br />
potential <strong>for</strong> visual and noise impact – see above comments]<br />
The turbine components would be brought in by specialist<br />
contractors. The movement of these loads will be tightly controlled<br />
through permits with the Highways authority and the police.<br />
Regional guidance <strong>for</strong> renewable energy in Yorkshire envisages<br />
development of wind farms in pockets of suburban and green belt<br />
land. There are existing wind farm developments within the green<br />
belt in England and PPS22 states that: „Local landscape and local<br />
nature conservation designations should not be used in<br />
themselves to refuse planning permission <strong>for</strong> renewable energy<br />
developments.‟<br />
This issue has been examined in detail by the UK Government.<br />
The report concluded that wind turbines are not a significant<br />
source of low frequency noise. In<strong>for</strong>mation on this issue will be<br />
contained in the Environmental Statement.<br />
Wind power is one of the most widely used, commercially<br />
developed renewable energy technologies in the UK. Modern<br />
turbines are more powerful and reliable than early prototypes,<br />
capturing considerable amounts of clean energy. A turbine used<br />
in the UK is likely to produce useful power <strong>for</strong> around 85% <strong>for</strong> the<br />
year over a lifespan of 20-25 years. Wind power reduces<br />
greenhouse gases by displacing conventional power generation.<br />
The UK is the windiest country in Western Europe and as such<br />
wind turbines have a higher capacity in the UK than elsewhere in<br />
Europe.<br />
The application <strong>for</strong> a grid connection does not <strong>for</strong>m part of this<br />
planning application. This will be a separate consenting process<br />
under section 37 of the electricity act by the electricity network<br />
operator when the point of connection <strong>for</strong> the wind farm is<br />
determined. The connection would be on wooden poles or<br />
underground depending on the final route. The scale of this<br />
proposal means that no new metal pylons would be required to<br />
connect the wind farm into the grid.<br />
3.22 The comments arising from the exhibitions were fed back into the EIA<br />
process <strong>for</strong> the scheme be<strong>for</strong>e the proposals were finalised and<br />
incorporated in this planning application.<br />
26<br />
Penny Hill Wind Farm<br />
Environmental Statement