14.08.2013 Views

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROPOSED TRANSPORT DATA<br />

Proposed Transport Data Summary<br />

11.30 An assessment has been carried out of the transport data during the<br />

periods of construction, operation and decommissioning and the impacts<br />

on the local and strategic road networks have been assessed against the<br />

baseline transport data.<br />

Assessment<br />

11.31 The proposed transport data has been analysed by phase and details the<br />

transport data <strong>for</strong> the construction, operation and decommissioning of the<br />

wind farm.<br />

CONSTRUCTION PHASE<br />

Trip Generation<br />

11.32 During the predicted 10 month construction period, the following traffic will<br />

access the site:<br />

HGVs, to deliver stone and concrete;<br />

flat-bed lorries, to deliver substation and trans<strong>for</strong>mer components;<br />

semi-low extendable trailers, to deliver turbine components (requiring<br />

escort);<br />

cranes, delivered as mobile units and on low-loaders; and<br />

construction personnel and deliveries, by private car, light van or<br />

minibus.<br />

11.33 The vehicles used to transport turbine components will constitute<br />

oversized vehicles / abnormal loads only on the delivery phase of the<br />

journey, as the trailers will be retracted during the return leg. Each delivery<br />

of turbine components there<strong>for</strong>e consists of one abnormal load movement<br />

on the outbound movement and one HGV movement on the return<br />

movement.<br />

11.34 Table 11.2 outlines the predicted traffic levels associated with the<br />

construction of the wind farm, over the 10-month, 10-hour working day<br />

construction period <strong>for</strong> standard HGVs, abnormal loads and light vehicles.<br />

This in<strong>for</strong>mation is shown as Total, Average Daily and Average Hourly<br />

movements.<br />

11.35 It will be endeavoured to source roadstone <strong>for</strong> the proposal from quarries<br />

in close proximity to the site, however this will be subsequent to availability<br />

and acceptability. All traffic movements bringing building materials to the<br />

site would have to approach the site from Junction 31 of the M1 and the<br />

A57 using the proposed access route into the site.<br />

11.36 It is hoped that local contractors would be employed wherever possible in<br />

the construction of the wind farm and they could approach the site from a<br />

variety of routes, depending on their point of origin, however the majority<br />

would be expected to approach the site from the M1. To assess a “worst-<br />

256<br />

Penny Hill Wind Farm<br />

Environmental Statement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!