Visual Assessment of Wind Farms – Best Practice, University of<br />

Newcastle (<strong>for</strong> Scottish Natural Heritage), 2002.<br />

CONSULTATION<br />

10.11 Consultation was undertaken with both statutory and non-statutory<br />

consultees, both at the scoping stage and as part of the assessment<br />

process. The main responses are summarised in Table 10.1.<br />

Table 10.1 Consultation Responses<br />

Consultee Response<br />

South Yorkshire Archaeology<br />

Advisory Service<br />

Highlighted the potential <strong>for</strong> unknown archaeological<br />

remains to survive within the site. Emphasised the need<br />

to consider indirect (primarily visual) effects, and asked<br />

that cumulative effects be assessed. Asked <strong>for</strong> initial<br />

geophysical survey and reserved right to require<br />

additional (intrusive) pre-determination evaluation,<br />

dependant on the results of the geophysics survey.<br />

English Heritage Drew attention to the guidance contained in Wind<br />

Energy and the Historic Environment.<br />

DESK-BASED ASSESSMENT AND WALKOVER SURVEY<br />

10.12 A desk-based assessment was undertaken by Archaeological Services,<br />

West Yorkshire Archaeology Service (ASWYAS), which used readily<br />

available documentary, cartographic and photographic evidence, to in<strong>for</strong>m<br />

the baseline condition of the site. A site visit and walkover by an<br />

experienced archaeologist was undertaken in June 2008 to validate the<br />

data gained as part of the desk-based assessment, and to identify (and if<br />

appropriate, record) any previously unrecorded cultural heritage features<br />

within the boundary. The Desk-Based Assessment Report was completed<br />

in July 2008 and is presented as Technical Report A10.1 (Appendix 6 of<br />

this ES).<br />

GEOPHYSICAL SURVEY<br />

10.13 A geophysical (magnetometer) survey was carried out over the footprint of<br />

the proposed development by ASWYAS. This was commenced in<br />

December 2008 and completed in January 2009. This included a 20m<br />

wide corridor over the access tracks, approximately 0.5ha coverage of the<br />

construction compound and substation control building location, and a 1ha<br />

area approximately centred at each turbine location (to allow <strong>for</strong> full<br />

coverage of a potential 50m micro-siting condition). The purpose was to<br />

allow a rapid scan of the whole proposed development footprint to in<strong>for</strong>m<br />

on the potential <strong>for</strong> unknown remains to survive and to determine the<br />

extent of any such remains. The in<strong>for</strong>mation obtained has also in<strong>for</strong>med<br />

the mitigation <strong>statement</strong> presented in paragraph 10.101 and subsequent<br />

text. The results are presented in a report presented as Technical Report<br />

A10.2 (Appendix 6).<br />

224<br />

Penny Hill Wind Farm<br />

Environmental Statement