14.08.2013 Views

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. INTRODUCTION<br />

THIS DOCUMENT<br />

1.1 This document <strong>for</strong>ms the Environmental Statement accompanying<br />

the application <strong>for</strong> planning permission made by Banks Renewables Ltd<br />

(the Applicant) to Rotherham Metropolitan Borough Council to develop the<br />

Penny Hill Wind Farm. The proposal site is located on farmland to the<br />

west of the M1 and M18 interchange south of Rotherham, to the east of<br />

the village of Ulley.<br />

1.2 The preparation of the Environmental Statement has been co-ordinated on<br />

behalf of the Applicant by TNEI Services Ltd. Detailed assessments of<br />

potential <strong>environmental</strong> effects have been undertaken by TNEI Services<br />

Ltd and other specialised consultants.<br />

ENVIRONMENTAL STATEMENT STRUCTURE<br />

1.3 The Environmental Statement (ES) describes the proposal and reports the<br />

findings of the Environmental Impact Assessment (EIA). The ES consists<br />

of the following documents:<br />

Non-Technical Summary – describing the proposal and summarising<br />

the findings of the EIA;<br />

Main Text and Figures – providing a detailed description of the<br />

proposal and its potential effects, reporting the findings of the EIA and<br />

providing other relevant background in<strong>for</strong>mation;<br />

Appendices - containing in<strong>for</strong>mation on consultation and relevant<br />

detailed reports of the sub-contractors; and<br />

Visualisations – containing the visualisations at A3 size prepared to<br />

accompany the landscape and visual assessment, including<br />

photomontage and wire frame diagrams from selected viewpoints.<br />

1.4 In addition, a Design & Access Statement and a Planning Statement in<br />

support of the application have been prepared. Copies of these <strong>statement</strong>s<br />

<strong>for</strong>m part of the planning application submission, although they do not <strong>for</strong>m<br />

part of the <strong>for</strong>mal ES.<br />

1.5 The Non Technical Summary, ES, ES Drawings, Appendices, Design &<br />

Access Statement and Planning Statement are presented in a single<br />

volume in an A4 sized ring bound folder. The landscape and visual impact<br />

assessment visualisations are presented in a separate bound A3 volume.<br />

1.6 This ES is split into three parts:<br />

Part 1 – Describes the EIA process, the policy background, the site and<br />

the proposed development;<br />

2<br />

Penny Hill Wind Farm<br />

Environmental Statement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!