SUMMARY OF EFFECTS<br />

11.99 The table below summarises the residual effects once the mitigation<br />

measures have been implemented.<br />

Table 11.5: Summary of Effects<br />

Potential Effect Mitigation Residual Effect<br />

Construction<br />

Increases in traffic flow Transport management plan Insignificant, temporary<br />

Accidents and safety<br />

Operation<br />

Site entrance upgrade and<br />

transport management plan<br />

273<br />

Insignificant, temporary<br />

Visual Distraction None required Insignificant, long term<br />

Increase in traffic None required Insignificant, long term<br />

Decommissioning<br />

Potential increases in traffic<br />

Transport management<br />

plan to be prepared prior to<br />

decommissioning.<br />

Insignificant, temporary<br />

11.100 This construction traffic assessment/transport <strong>statement</strong> concludes that<br />

there would be a short term, insignificant increase in traffic levels <strong>for</strong> both<br />

of the access routes to the site. A transport management plan will be<br />

provided to minimise and control any minor impacts of the proposed<br />

construction traffic.<br />

11.101 Abnormal loads will be normally timed during off-peak periods in order to<br />

avoid delays to other road users at times to be agreed with the police and<br />

the highways authorities.<br />

11.102 Traffic generated during the operation and maintenance of the wind farm<br />

will be minimal and will not result in any significant impact.<br />

11.103 Traffic generated during decommissioning of the wind farm is likely to be<br />

lower than the levels associated with construction and is there<strong>for</strong>e not<br />

expected to be significant. An appropriate decommissioning assessment<br />

would be undertaken and a transport management plan prepared prior to<br />

the decommissioning of the wind farm.<br />

Penny Hill Wind Farm<br />

Environmental Statement