considered to constitute acceptable mitigation. Once the preservation of<br />

the archaeological remains has been secured (by record) the residual<br />

direct effect upon the cultural heritage remains will be considered “not<br />

significant”.<br />

10.116 No significant indirect (principally visual) effects are anticipated upon any<br />

features of cultural heritage interest.<br />

Table 10.8 Details the Summary of the Potential Effects, Mitigation<br />

and Residual Effects<br />

Potential Effect Mitigation Residual Effect<br />

Construction Effects<br />

Potential <strong>for</strong> damage or<br />

destruction of unknown<br />

archaeological remains<br />

(direct effects on features<br />

within the site boundary).<br />

The significance would be<br />

“minor” to “moderate”<br />

depending on the nature of<br />

any remains encountered.<br />

Indirect effects upon<br />

settings of some cultural<br />

heritage features beyond<br />

site boundary (e.g. from<br />

presence of cranes). These<br />

would be temporary and<br />

not significant.<br />

Operational Effects<br />

No significant direct effects<br />

are anticipated upon<br />

cultural heritage features.<br />

No significant effects are<br />

anticipated upon the<br />

archaeological and historic<br />

settings of any cultural<br />

heritage features.<br />

Decommissioning Effects<br />

No direct impacts are<br />

anticipated 2 .<br />

Removal of potential<br />

indirect, visual effects upon<br />

settings of some cultural<br />

heritage features beyond<br />

the site boundary.<br />

Implementation of an<br />

appropriate scheme of<br />

archaeological work,<br />

both in advance of and<br />

during construction,<br />

leading to preservation<br />

by record. Geophysical<br />

survey has already been<br />

undertaken.<br />

None proposed or<br />

considered practicable.<br />

None proposed. None.<br />

None proposed or<br />

considered practicable<br />

(beyond that embedded<br />

in the final designed<br />

layout).<br />

None proposed. None.<br />

247<br />

Not Significant.<br />

None (temporary effects).<br />

Indirect effects upon settings<br />

of some cultural heritage<br />

features, which are temporary<br />

and reversible and of minor<br />

significance.<br />

None proposed. Restoration of previously<br />

existing settings 9 .<br />

9 Notwithstanding other changes to their settings that may have occurred since the construction the<br />

proposed development, not relating to the proposed development.<br />

Penny Hill Wind Farm<br />

Environmental Statement