Arrangements with Police <strong>for</strong> escort of turbine loads to the site;<br />

Advanced notification to the general public warning of turbine<br />

component transport movements;<br />

In<strong>for</strong>mative road signage warning other users of turbine components<br />

transport movements and construction traffic;<br />

Improvements and upgrades to the public highway;<br />

Arrangements <strong>for</strong> continual road maintenance and cleaning;<br />

Specific timing of deliveries outside of peak hours;<br />

Wheel cleaning / dirt control arrangements at key stages of<br />

construction; and<br />

Provision of temporary signs and traffic control where necessary.<br />

11.92 An appropriate police or contractor escort would accompany movement of<br />

turbine components from the port of entry, with timings agreed with the<br />

highways authorities.<br />

11.93 The route that would be used to transport turbine components to the site<br />

would utilise the nearest appropriate port approved by the selected turbine<br />

manufacturer and would be selected in order to minimise road upgrades<br />

and improvements.<br />

11.94 No specific mitigation measures would be required during operation of the<br />

wind farm, due to the low numbers of operational vehicle movements.<br />

11.95 A transport management plan would be prepared <strong>for</strong> the decommissioning<br />

process to ensure that traffic impacts at this time are minimised.<br />

11.96 The new junction onto Penny Hill Lane will include road widening to both<br />

lanes on the eastern approach to the junction, which will enable oversized<br />

vehicles to navigate the turns into the site. The ground would also be<br />

prepared to accept suitable axle loadings. The upgraded junction proposal<br />

is shown on Drawing HJB/681/PA14. Detailed swept path analysis<br />

drawings of the proposed site entrance are included in Appendix 7.<br />

RESIDUAL EFFECTS<br />

11.97 The mitigation measures described above and the short-term increase in<br />

traffic would ensure that there would be minimal residual <strong>environmental</strong><br />

impact. This is justified by the following:<br />

The effects associated with the traffic during the operational phase are<br />

insignificant as stated within the “Guidance on Transport<br />

Assessments”;<br />

271<br />