6.413 The top of the meteorological mast would also just be visible but the<br />

access tracks, control building and substation would be screened by<br />

intervening vegetation.<br />

6.414 Where visible, the turbines would not detract notably from the visual<br />

amenity experienced by the transient receptors using the route. Although<br />

prominent <strong>for</strong> a short stretch of the motorway approaching junction 32 of<br />

the M1, in the context of other numerous built structures visible whilst<br />

driving southwest along any length of the M1, the turbines would result in a<br />

low magnitude of change in the views experienced by users of the<br />

motorway.<br />

Significance of Operational Effects on View<br />

6.415 It is there<strong>for</strong>e considered that the proposed development would result in<br />

no greater than a slight effect on the visual amenity of the transient visual<br />

receptors using this route.<br />

Decommissioning Phase<br />

6.416 From the majority of the M1, there would be no view of the works at<br />

ground level during the decommissioning phase. The only additional<br />

impact over and above those assessed as permanent under the heading<br />

of Operational Phase would be a minor view of the cranes removing the<br />

turbines. However this would be <strong>for</strong> a relatively short time period and<br />

would be less prominent that the turbines being removed.<br />

6.417 There<strong>for</strong>e there would be no additional effect on the viewpoint during<br />

decommissioning over and above those assessed as permanent under the<br />

heading of Operational Phase.<br />

Cumulative Effects<br />

6.418 Although the cumulative ZTVs suggest that the AMRC and Loscar sites<br />

would be visible at this location, in reality, due to intervening vegetation<br />

and structures, none of the other cumulative sites would be visible from<br />

this viewpoint.<br />

6.419 There<strong>for</strong>e there would be no additional cumulative effect on the visual<br />

amenity experienced within the village.<br />

VIEWPOINT 9 LAUGHTON EN LE MORTHEN<br />

Nature and Sensitivity of Baseline View<br />

6.420 This viewpoint is representative of the view experienced by properties in<br />

the west of Laughton en le Morthen which have west facing windows or<br />

gardens. It is also representative of the view from the Scheduled Ancient<br />

Monument immediately to the west of the village and the two public<br />

footpaths which run to the west of the village.<br />

118<br />

Penny Hill Wind Farm<br />

Environmental Statement