links, 3 T-Mobile links, 5 Vodafone links and 7 JRC links which are within<br />

proximity of the site. These links are identified within PA20. PA20 also<br />

identifies the Vodafone links identified within this initial consultation and<br />

thus the ef<strong>for</strong>t which has been made to mitigate against effect upon these<br />

lines through appropriate design of the wind farm proposal. PA06 also<br />

identifies this mitigation through design along with other potential site<br />

development constraints.<br />

14.7 Ofcom were further consulted once a variety of constraints had been<br />

considered and the design of the proposal had been furthered. A copy of<br />

the response, dated February 2008, is included in Appendix 10. Ofcom<br />

advised that Vodafone Ltd, Hutchinson 3G UK Ltd, Airwave Solutions Ltd,<br />

T-Mobile and Mll Telecom Ltd should be consulted. These companies<br />

were each contacted by the Applicant. In addition, CSS Spectrum<br />

Management Services Ltd (CSS) and the Joint Radio Company (JRC),<br />

who manage fixed link radio connections on behalf of electricity and gas<br />

utility companies, were also contacted.<br />

14.8 Once the turbine locations were fixed and following the site design works<br />

having been guided by the response giving by Ofcom, the relevant<br />

telecoms operators and service providers were in<strong>for</strong>med of the grid<br />

references and asked <strong>for</strong> final comments. This included repeating the<br />

consultation request with Ofcom. The Ofcom response (included in<br />

Appendix 10) included only one additional fixed link operator to be<br />

consulted (Orange Pcs).<br />

14.9 The most recent responses received from the relevant link operators and<br />

service providers are contained in Appendix 10 and a summary is provided<br />

below:<br />

Vodafone Ltd – Commented that some of the turbine locations<br />

proposed are not acceptable to Vodafone due to their microwave<br />

network in the area. The Applicant has assessed the locations of these<br />

links and concluded that one link is likely to be affected due to the<br />

proximity to one of the turbines. An investigation is underway to<br />

determine whether the other links could be affected by the proposed<br />

development and discussions will be held with Vodafone in due course;<br />

It should be noted that there has been some disparity in the in<strong>for</strong>mation<br />

provided by Vodafone with initial correspondence having indicated only<br />

5 links passing across or near to the site (dated 02.08.2006). It should<br />

also be noted that the initial consultation with Ofcom identified only 5<br />

Vodafone links.<br />

PA25 indicates the location of the original 5 Vodafone links identified.<br />

PA26 identifies the location of the subsequent additional 5 Vodafone<br />

links identified.<br />

290<br />

Penny Hill Wind Farm<br />

Environmental Statement