14.08.2013 Views

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

environmental statement - Rotherham's Online Application for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14.15 The consultation concluded the development would be likely to affect 57<br />

homes <strong>for</strong> which there is no alternative off-air service and up to 10,966<br />

homes where an alternative service will be required.<br />

14.16 The extent of interference on television reception will only become<br />

apparent following the commissioning of the wind farm. Effects from wind<br />

turbine blades affect analogue signals considerably more than digital<br />

signals. The switchover <strong>for</strong> terrestrial TV transmitters from analogue to<br />

digital service in Yorkshire is due to take place in 2011. If however<br />

unacceptable levels of interference are experienced following construction<br />

of the proposed development, a number of different mitigation measures<br />

are available, including:<br />

Reorientation of aerial to an alternative transmitter;<br />

Re-siting of aerial;<br />

Installation of higher quality aerial; or<br />

Switch to digital service or cable service.<br />

14.17 The Applicant will commit, by way of a planning condition, to appropriate<br />

mitigating options that are available, if unacceptable levels of interference<br />

are experienced as a result of the proposed wind farm.<br />

SUMMARY OF EFFECTS<br />

14.18 The proposed development has the potential to affect radiocommunication<br />

links operated by YEDL, National Grid Gas and Vodafone.<br />

The relevant studies have been undertaken and discussions are underway<br />

between the Applicant and the relevant link operators in order to agree any<br />

mitigation measures that may be required. Once mitigation measures<br />

have been agreed with YEDL and National Grid Gas, JRC withdraw their<br />

objections on behalf of these two companies.<br />

14.19 The wind farm has the potential to interfere with television reception in the<br />

area. The Applicant will accept suitable planning condition(s) to resolve<br />

any issues with affected services. Following such mitigation the residual<br />

impact would be negligible.<br />

293<br />

Penny Hill Wind Farm<br />

Environmental Statement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!