324<br />

Figure 8.2<br />

EU Transport Grants to CEEC pre-ISPA (Phare 1990-97 and LISF 1998-99)<br />

Airports &<br />

Ports<br />

5%<br />

Railways<br />

34%<br />

Other<br />

7%<br />

Roads &<br />

Highways<br />

54%<br />

Total funds<br />

disbursed:<br />

978 MECU<br />

Source: Own Compilation using data from the EU Phare Program<br />

8.3 A Precursor to Cohesion Funding? Overview of ISPA Priorities<br />

In its final agreed form, ISPA evenly divides a total of € 1.04 billion a year at<br />

1999 prices between transport infrastructure and environment projects for the next six<br />

years.<br />

ISPA is strongly accession-oriented, and will closely follow the format of the<br />

Cohesion Fund. However, since contrary to the Cohesion Fund, ISPA is dealing with<br />

applicant, rather than member states, the distribution of funds is not decentralized (yet)<br />

but requires ex-ante approval of tendering and contracting. 15<br />

The country-by-country<br />

allocation is based on three criteria: population, per capita GDP and land surface area.<br />

Table 8.1 shows the per country allocation, given by the Commission as a range. Poland<br />

alone is thus to receive roughly one third of all ISPA grants, Hungary less than one tenth.<br />

All countries have to submit National ISPA Strategy Papers and present a coherent<br />

investment plan. Only very small portions of ISPA money will be used for preparatory<br />

studies and technical assistance. The leveraging of additional international co-financing<br />

15 However, a recent DG Regio paper (CEC, DG Regio 2000) notes that “Coordination regulation 1266/99<br />

of 21 June 1999 (art 12.2) opens the possibility for waiving the ex-ant approval requirement and for<br />

conferring on implementation agencies management of aid on a decentralized basis. This will however<br />

only be decided on the basis of a case by case analysis of the management capacity, financial control<br />

procedures and structures regarding public finance.”