339<br />

that had previously received most Phare and IFI funding. This strategic focus was then<br />

consistently integrated into the formulation of the Polish ISPA Transport Strategy. At the<br />

point that the document was published, the projects for submission in 2000 had already<br />

been chosen, and all three had received funding. Table 8.2 presents an overview of both<br />

the planned ISPA projects until 2006 and those that had received funding until December<br />

31, 2001.<br />

Table 8.2 Overview of ISPA Transport Grants to Poland<br />

ISPA Transport Grants to Poland TINA Planned Approved<br />

(in Million €) Location? ('00-'06) ('00-'01)<br />

Modernization E-20 Railline Rzeptin-Border Corridor II 30,00 17,72<br />

Modernization of the Poznan rail node E-20 Corridor II 200,00 50,58<br />

Rail Improvements / Liquidation of Bottlenecks Corridors & Add. 83,25<br />

Modernization E-30 Railline Wegliniec-Legnica Corridor III 186,00 92,84<br />

Technical Assistance Modernization E-65 Railline Corridor VI 5,96<br />

Modernization E-65 Railline Warsaw-Dzialdowo Corridor VI 270,00<br />

Modernization E-20 Railline Siedlce - Terespol Corridor II 288,00<br />

PERCENTAGE OF GRANTS RAIL SECTOR 40% 46%<br />

Construction A4 Highway Klesczów - Sosnica Corridor III 120,00 84,21<br />

Reconstruction A4 Highway Krzyzowa - Wroclaw * Corridor III 374,00 189,53<br />

11.5 Axle Load Strenghthening on National Roads Corridors I,II, III, VI 496,00 62,12<br />

11.5 Axle Load A4 Highway and Nat'l Road No. 4 Corridor III & Add. 46,67<br />

11.5 Axle Load Nat'l Road No. 717 Corridor II 24,57<br />

Project Management Training of Staff N/A 0,40<br />

Pre-Feasibility Study Warsaw Transport Node Corridors I,II & VI 0,71<br />

Kwiatkowski access route to seaport of Gdynia Corridor VI 47,00<br />

Construction Nat'l Road No.1 Skoczow-Ciezyn Corridor VI 47,00<br />

Modernization Nat'l Road S 18 Wyszkow * Corridor I 80,00<br />

Construction Nat'l Road No.1 Bielsko-Skoczow Corridor VI 38,00<br />

Construction A4 Highway Zgorzelec - Krzyzowa * Corridor III 285,00<br />

Road Access to port of Gdansk Corridor VI 71,00<br />

Modernization S-94 National Road Zywiec-Zwardon Corridor VI 97,00<br />

PERCENTAGE OF GRANTS ROAD SECTOR 60% 54%<br />

* = Listed in National Strategy as 2 Projects Total 2741,00 752,00<br />

Source: Own compilation using data from the European Commission DG Regional<br />

Policy ISPA Website (http://europa.eu.int/comm/regional_policy/funds/ispa/ispa_en.htm)<br />

and the National ISPA Transport Strategy Poland