Nonetheless, the Planning Commission recommended that the project provide a total <strong>of</strong><br />

10 units (20%) on-site as affordable units. The level <strong>of</strong> affordability for the units would<br />

consist <strong>of</strong> five very-low income one-bedroom units, and five moderate-income studio<br />

units defined as 80% <strong>of</strong> the area median income (instead <strong>of</strong> typical 100% <strong>of</strong> area<br />

median as defined by AHPP). The applicant does not agree with the Commission’s<br />

recommendation, and has chosen not to modify their proposal <strong>of</strong> eight on-site affordable<br />

units. Based on KMA’s financial analysis, the cost to the applicant <strong>of</strong> providing three<br />

low income studio units @ 60% Area Median Income (AMI), as currently proposed by<br />

the applicant, would be approximately $746,700. A s recommended by the Planning<br />

Commission, the cost to the applicant <strong>of</strong> providing five moderate income studio units @<br />

80% AMI would be approximately $935,500. The difference between the two scenarios<br />

would be $188,800.<br />

LEED® Platinum Certification<br />

The Commission recommended that the project be designed and constructed to<br />

achieve a minimum LEED® Platinum certification as established by the LEED® Rating<br />

System. The applicant has expressed concerns with achieving platinum status based<br />

on the difficulties in obtaining the required LEED points. The applicant states that<br />

project’s location as an urban infill residential project limits the project from obtaining<br />

readily available points, and is therefore required to seek points in other development<br />

areas that they believe is cost-prohibitive. The applicant has agreed to design the<br />

project to achieve a LEED® Gold certification as established by the LEED® Rating<br />

System.<br />

Solar Panels<br />

The Commission recommended that the project provide an adequate amount <strong>of</strong> solar<br />

panels that would fully <strong>of</strong>f-set the energy required to operate the common areas (lighting<br />

for internal hallways, etc.) <strong>of</strong> the project. The applicant proposes to provide 24 solar<br />

panels on t he ro<strong>of</strong>, which may equate to providing approximately half <strong>of</strong> the energy<br />

required to operate the common areas.<br />

20