streetscape and continuing the line <strong>of</strong> Metro signature palm trees on both sides <strong>of</strong> 4 th<br />

Street to further reinforce north south connections, to integrate better with the Metro<br />

station and to provide orientation and wayfinding elements along the pedestrian<br />

route to and from the station and Downtown. Funding: The 4 th Street / Colorado<br />

Avenue intersection improvements are included in the core project. The original<br />

RFP for the Colorado Esplanade Design identified the need to strengthen<br />

connections north and south between the Civic Center and Downtown by<br />

encouraging the designer to look outside the Metro grant project boundaries for<br />

areas or elements to enhance connections. PWP has designed a widened sidewalk<br />

on 4 th Street north <strong>of</strong> Colorado to strengthen the connection from the station to<br />

Downtown; however, based on funding limitations, the 4 th Street improvements north<br />

and south <strong>of</strong> the intersection are not included in the core project. C ity staff has<br />

applied for a separate Metro grant to complete these improvements in the future.<br />

2. Colorado Avenue, between 4 th and 5 th Streets: The interface between the station<br />

and the Colorado Esplanade occurs most directly on the block <strong>of</strong> Colorado between<br />

4 th and 5 th Streets. Therefore, the coordination between two separate projects,<br />

Expo’s light rail station and the <strong>City</strong>’s Colorado Esplanade, were central to creating a<br />

seamless pedestrian experience. For schedule and coordination efficiencies due to<br />

Expo’s limits <strong>of</strong> construction on Colorado, the south sidewalk pavers, the cycle track,<br />

the roadway and the string lights on both sides <strong>of</strong> Colorado are being incorporated<br />

into the <strong>City</strong>’s betterment for the Expo 4 th Street Station project. The north sidewalk,<br />

also designed with the Esplanade street tree and custom pavers, is outside <strong>of</strong> the<br />

Expo construction limit and would therefore need to be constructed by the <strong>City</strong> or by<br />

adjacent property owners, either in close coordination with Expo, or after Expo<br />

construction activities have concluded.<br />