11.07.2014 Views

Agenda - City of Santa Monica

Agenda - City of Santa Monica

Agenda - City of Santa Monica

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

credits (that shall be prepared by the LEED® accredited pr<strong>of</strong>essional) for<br />

review by the <strong>City</strong>, along with a narrative to demonstrate that the Project<br />

is likely to achieve the Sustainable Design Status.<br />

B. Prior to issuance <strong>of</strong> a building permit, Developer shall grant access to the<br />

<strong>City</strong>’s Green Building Program Advisor as a “Project Team Manager” to<br />

the project’s documentation in the LEED Online system. The <strong>City</strong>’s<br />

Green Program Advisor will use this online documentation to verify that<br />

the project is reasonably likely to achieve the Sustainable Design Status.<br />

C. Prior to issuance <strong>of</strong> a final Certificate <strong>of</strong> Occupancy for the Project, the<br />

<strong>City</strong> Advisor shall verify (which verification shall not be unreasonably<br />

withheld, conditioned or delayed) that the Project has achieved the<br />

Sustainable Design Status.<br />

D. Notwithstanding the foregoing, if the <strong>City</strong>’ has not verified that the<br />

constructed Project has achieved the Sustainable Design Status, the <strong>City</strong><br />

shall nonetheless issue a temporary Certificate <strong>of</strong> Occupancy for the<br />

Project (assuming that the Project is otherwise entitled to receive a<br />

temporary Certificate <strong>of</strong> Occupancy). The temporary Certificate <strong>of</strong><br />

Occupancy shall be converted to a final Certificate <strong>of</strong> Occupancy once the<br />

constructed Project has achieved the Sustainable Design Status.<br />

E. If the Project is denied certification for the Sustainable Design Status by<br />

the Green Building Certification Institute, and the Developer is unwilling<br />

or unable to appeal the denial <strong>of</strong> certification, then the Developer shall<br />

ensure that the Project achieves certification to the Gold level under the<br />

LEED Existing Buildings Operations & Maintenance (LEED EBOM)<br />

rating system that is current at the time that the temporary Certificate <strong>of</strong><br />

Occupancy was issued for the Project. Developer shall ensure that the<br />

Project achieves the Gold level LEED EBOM certification no later than 2<br />

years after the temporary Certificate <strong>of</strong> Occupancy was issued for the<br />

Project.<br />

9. Photovoltaic Solar Panels. Photovoltaic solar panels shall be installed on the<br />

ro<strong>of</strong> deck in accordance with the Project Plans.<br />

10. Electric Vehicle Charging Stations. Developer shall install in the subterranean<br />

parking garage not less than five (5) 208/240 V 40 amp AC outlets (or panel<br />

capacity and conduit for the future installation <strong>of</strong> such 5 electrical outlets),<br />

designed to allow the simultaneous charging <strong>of</strong> electric vehicles.<br />

11. Local Hiring. Developer shall implement the local hiring program set forth in<br />

Exhibit “F”.<br />

65<br />

F:\RECORDSANDELECTIONSHARE\MEETINGS\WWW\2013\20130514\WORD DOCUMENTS\2013051407-A-2.DOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!