<strong>City</strong> Council Report<br />

To:<br />

From:<br />

Mayor and <strong>City</strong> Council<br />

<strong>City</strong> Council Meeting: May 14, 2013<br />

<strong>Agenda</strong> Item: 8-A<br />

David Martin, Director <strong>of</strong> Planning and Community Development<br />

Subject: Colorado Esplanade Final Design and CCSP Amendment<br />

Recommended Action<br />

Staff recommends that the <strong>City</strong> Council:<br />

1. Approve the final design for the full Colorado Esplanade as proposed, direct staff<br />

to prepare a bid package, and solicit bids for the reduced footprint core project;<br />

2. Amend the CCSP to eliminate the 2 nd Street Bridge Extension as a pu blic<br />

improvement, and replace with the planned Main to 2 nd Street alignment<br />

proposed by the Colorado Esplanade project.<br />

Executive Summary<br />

This report recommends approval <strong>of</strong> the final design for the Colorado Esplanade, a<br />

circulation infrastructure and streetscape project located between the future terminus <strong>of</strong><br />

the regional Expo light rail line, the Downtown, and one <strong>of</strong> the <strong>City</strong>’s most prominent<br />

landmarks, the <strong>Santa</strong> <strong>Monica</strong> Pier. Due to funding limitations, this report recommends a<br />

first phase <strong>of</strong> construction for a core project with a slightly reduced footprint from the<br />

project presented at the February 14, 2012 Council meeting. Additional funding is being<br />

sought to construct the full project in subsequent phases. Also recommended in this<br />

report is a minor amendment <strong>of</strong> the Civic Center Specific Plan (CCSP) to achieve the<br />

CCSP vision for connecting the Civic Center and Downtown Districts by replacing the<br />

2 nd Street Bridge concept with the proposed Esplanade alignment <strong>of</strong> Main and 2 nd<br />

Streets.<br />

With the arrival <strong>of</strong> the Exposition Light Rail in 2016, the Esplanade project would resolve<br />

the complex circulation needs adjacent to the new Expo Light Rail station at 4 th<br />

Street/Colorado Avenue, including provision <strong>of</strong> additional space to safely accommodate<br />

anticipated pedestrian surges. The project would address the community vision for an<br />

integrated light rail system, easily accessed from key destinations and by multiple travel<br />

modes. The final design <strong>of</strong> the Colorado Esplanade by Peter Walker Partners (PWP)<br />

organizes arrival/departure for drivers, bicyclists, pedestrians and bus and transit<br />

patrons, while creating a C ity gateway that integrates the beach, Civic Center and<br />

Downtown.<br />