11.07.2014 Views

Agenda - City of Santa Monica

Agenda - City of Santa Monica

Agenda - City of Santa Monica

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Total Floor Area <strong>of</strong> Building or Project<br />

• Basic Allowable Floor Area<br />

• Floor Area for each room or area<br />

• Detail allowable area increase calculations<br />

Corridor Construction<br />

• Type <strong>of</strong> Construction<br />

• Detail any and all code exceptions being used<br />

Occupant Load Calculations<br />

• Occupancy Classification for each room or area.<br />

• Occupant Load Calculation for each room or area based on use or occupancy<br />

• Total Proposed Occupant Load<br />

Means <strong>of</strong> Egress<br />

• Exit width calculations<br />

• Exit path <strong>of</strong> travel<br />

• Exit Signage and Pathway Illumination (low level exit signage)<br />

Atria - Atria shall comply with CBC Section 404 as follows:<br />

• Atria shall not be permitted in buildings containing Group H Occupancies.<br />

• The entire building shall be sprinklered.<br />

• A mechanically operated smoke-control system meeting the requirements <strong>of</strong><br />

Section 909 and 909.9 shall be installed.<br />

• Smoke detectors shall be installed in accordance with the Fire Code.<br />

• Except for open exit balconies within the atrium, the atrium shall be separated<br />

from adjacent spaces by one-hour fire-resistive construction. See exceptions to<br />

Section 404.6.<br />

90<br />

F:\RECORDSANDELECTIONSHARE\MEETINGS\WWW\2013\20130514\WORD DOCUMENTS\2013051407-A-2.DOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!