11.07.2014 Views

Agenda - City of Santa Monica

Agenda - City of Santa Monica

Agenda - City of Santa Monica

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

To: Steve Mizokami, <strong>City</strong> <strong>of</strong> <strong>Santa</strong> <strong>Monica</strong> April 23, 2013<br />

Subject: 1320 2 nd Street: Value Enhancement & Fiscal Impact Analysis Page 10<br />

b. The retail building costs are estimated at $120 per square foot <strong>of</strong> retail<br />

GBA.<br />

5. The retail tenant improvement costs are estimated at $30 per square foot <strong>of</strong> retail<br />

GBA.<br />

6. The contractor fees and general requirements costs are estimated at 14% <strong>of</strong><br />

construction costs.<br />

7. An allowance for builder’s risk insurance was provided equal to 2% <strong>of</strong><br />

construction costs.<br />

8. A direct cost contingency allowance equal to 5% <strong>of</strong> other direct costs was<br />

provided.<br />

KMA estimates the total direct costs at $11.88 million, or $255 per square foot <strong>of</strong> GBA.<br />

Indirect Costs<br />

KMA utilized the following assumptions to estimate the Proposed Project indirect costs:<br />

1. The architecture, engineering and consulting costs are estimated at 6% <strong>of</strong> direct<br />

costs.<br />

2. <strong>City</strong> staff estimated the public permits and fees costs at approximately $14.05<br />

per square foot <strong>of</strong> GBA.<br />

3. The taxes, insurance, legal and accounting costs are estimated at 2% <strong>of</strong> direct<br />

costs.<br />

4. The marketing and leasing costs are estimated as follows:<br />

a. The residential marketing costs are estimated at 2% <strong>of</strong> direct costs; and<br />

b. The retail leasing commissions are estimated at $3.00 per square foot <strong>of</strong><br />

retail GBA.<br />

5. A development management fee estimated at 4% <strong>of</strong> direct costs is provided.<br />

6. An indirect cost contingency allowance equal to 5% <strong>of</strong> other indirect costs is<br />

provided.<br />

KMA estimates the total indirect costs at $2.45 million.<br />

1210011_v4;SM:TRB<br />

19305.013.001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!