11.07.2014 Views

Agenda - City of Santa Monica

Agenda - City of Santa Monica

Agenda - City of Santa Monica

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air Quality<br />

j. State whether any construction activity beyond normally permitted hours<br />

is proposed;<br />

k. Describe any proposed construction noise mitigation measures, including<br />

measures to limit the duration <strong>of</strong> idling construction trucks;<br />

l. Describe construction-period security measures including any fencing,<br />

lighting, and security personnel;<br />

m. Provide a grading and drainage plan;<br />

n. Provide a construction-period parking plan which shall minimize use <strong>of</strong><br />

public streets for parking;<br />

o. List a designated on-site construction manager;<br />

p. Provide a construction materials recycling plan which seeks to maximize<br />

the reuse/recycling <strong>of</strong> construction waste;<br />

q. Provide a plan regarding use <strong>of</strong> recycled and low-environmental-impact<br />

materials in building construction; and<br />

r. Provide a construction period urban run<strong>of</strong>f control plan.<br />

105. Dust generated by the development activities shall be kept to a minimum with a<br />

goal <strong>of</strong> retaining dust on the site through implementation <strong>of</strong> the following<br />

measures recommended by the SCAQMD Rule 403 Handbook:<br />

• During clearing, grading, earth moving, excavation, or transportation <strong>of</strong><br />

cut or fill materials, water trucks or sprinkler systems are to be used to the<br />

extent necessary to prevent dust from leaving the site and to create a crust<br />

after each day’s activities cease.<br />

• Vehicles hauling dirt or other construction debris from the site shall cover<br />

any open load with a tarpaulin or other secure covering to minimize dust<br />

emissions. Immediately after commencing dirt removal from the site, the<br />

general contractor shall provide the <strong>City</strong> with written certification that all<br />

trucks leaving the site are covered in accordance with this condition <strong>of</strong><br />

approval.<br />

• During clearing, grading, earth moving, excavation, or transportation <strong>of</strong><br />

cut or fill materials, streets and sidewalks within 150 feet <strong>of</strong> the site perimeter<br />

shall be swept and cleaned a minimum <strong>of</strong> twice weekly or as frequently as<br />

required by the PWD.<br />

81<br />

F:\RECORDSANDELECTIONSHARE\MEETINGS\WWW\2013\20130514\WORD DOCUMENTS\2013051407-A-2.DOC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!