11.07.2014 Views

Agenda - City of Santa Monica

Agenda - City of Santa Monica

Agenda - City of Santa Monica

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

To: Steve Mizokami, <strong>City</strong> <strong>of</strong> <strong>Santa</strong> <strong>Monica</strong> April 23, 2013<br />

Subject: 1320 2 nd Street: Value Enhancement & Fiscal Impact Analysis Page 5<br />

Indirect Costs<br />

KMA utilized the following assumptions to estimate the indirect costs for the Base Zoning<br />

Alternative:<br />

1. The architecture, engineering and consulting costs are estimated at 8% <strong>of</strong> direct<br />

costs.<br />

2. <strong>City</strong> staff estimated the public permits and fees costs at approximately $14.05<br />

per square foot <strong>of</strong> GBA. 2<br />

3. The <strong>City</strong>’s affordable housing in-lieu fee is estimated at $13.68 per square foot <strong>of</strong><br />

net residential area.<br />

4. The taxes, insurance, legal and accounting costs are estimated at 3% <strong>of</strong> direct<br />

costs.<br />

5. The marketing and leasing costs are estimated as follows:<br />

a. The residential marketing costs are estimated at 2% <strong>of</strong> direct costs; and<br />

b. The retail leasing commissions are estimated at $3.00 per square foot <strong>of</strong><br />

retail GBA.<br />

6. A development management fee estimated at 4% <strong>of</strong> direct costs is provided.<br />

7. An indirect cost contingency allowance equal to 5% <strong>of</strong> other indirect costs is<br />

provided.<br />

KMA estimates the total indirect costs at $1.47 million<br />

Financing Costs<br />

The financing costs for the Base Zoning Alternative are estimated as follows:<br />

1. The construction period and absorption period interest costs are estimated at<br />

$469,000. These costs are based on the following assumptions:<br />

a. The construction period interest costs are based on a 5.5% interest rate,<br />

an 18-month construction period, and a 60% average outstanding loan<br />

balance.<br />

2 <strong>City</strong> staff provided KMA an estimate <strong>of</strong> the public permits and fees for the Proposed Project.<br />

KMA extrapolated this estimate to estimate the public permits and fees for the Base Zoning<br />

Alternative.<br />

1210011_v4;SM:TRB<br />

19305.013.001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!