09.01.2015 Views

SaHF DMBC Volume 1 Edition 1.1.pdf - Shaping a healthier future

SaHF DMBC Volume 1 Edition 1.1.pdf - Shaping a healthier future

SaHF DMBC Volume 1 Edition 1.1.pdf - Shaping a healthier future

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.3.7 Theme 7: Proposals for out of hospital care<br />

There is an ambition to offer more healthcare services out of hospital.<br />

Figure 6.8: Theme 7 – Proposals for out of hospital care<br />

Feedback received<br />

Stakeholders who<br />

provided this<br />

feedback<br />

Our consideration of the feedback<br />

<strong>DMBC</strong> reference<br />

Assurances required<br />

that out of hospital<br />

care will be ready and<br />

able to meet demand<br />

before acute services<br />

reconfigure<br />

Brent LINk<br />

Richmond LINk<br />

Kensington &<br />

Chelsea LINk<br />

Hillingdon LINk<br />

Ealing HOSC<br />

JHOSC<br />

Hammersmith &<br />

Fulham HOSC<br />

Hounslow HOSC<br />

Kensington &<br />

Chelsea HOSC.<br />

The Case for Change states that it is essential to ensure that out of hospital<br />

services are working well in order to ensure an improvement in the whole<br />

healthcare system in NW London. Patient safety is critical and we remain<br />

committed to ensuring services continue to be safe when any changes are<br />

made. It is also important to remember that CCGs are already<br />

commissioning, running and monitoring out of hospital services and these<br />

services are safe.<br />

During implementation we expect some services to be ‘double run’,<br />

particularly while capacity in community services is developed; refer to our<br />

implementation plans for further details. We have created a monitoring<br />

mechanism for key out of hospital initiatives across the eight CCGs and<br />

mapping this to actual changes in the system, for example, through<br />

monitoring system-wide impact on beds and the use of beds. This<br />

‘implementation tracker’ has been developed for use at CCG and system<br />

level.<br />

Implementation plans:<br />

Chapter 17<br />

Implementation tracker:<br />

Chapter 17, Section<br />

17.4.6<br />

Safety during<br />

implementation:<br />

Chapter 17, Section<br />

17.4.5<br />

We have developed a decision making framework that aims to ensure any<br />

service change only occurs when it is safe to do so; this builds upon existing<br />

governance structures for commissioning services.<br />

Out of hospital plans<br />

are not detailed<br />

enough to support<br />

implementation<br />

Harrow HOSC/<br />

Council<br />

Ealing Council<br />

JHOSC<br />

Hillingdon LINk<br />

Kensington &<br />

Chelsea HOSC.<br />

High level implementation plans were developed pre-consultation and these<br />

were sufficient for the JCPCT to decide to proceed to consultation.<br />

CCGs have developed more detailed out of hospital implementation plans<br />

during decision making based upon their 2013/14 CCG commissioning<br />

intentions. This work is included in this document.<br />

Out of hospital plans:<br />

Chapter 16<br />

Implementation plans:<br />

Chapter 17<br />

6. Consultation, feedback and how we responded 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!