15.11.2012 Views

State Mission Mode Project e-district - Department of Electronics and ...

State Mission Mode Project e-district - Department of Electronics and ...

State Mission Mode Project e-district - Department of Electronics and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Study Report on Assessment <strong>of</strong> the <strong>Mode</strong>l e-<strong>district</strong>s<br />

Revision <strong>of</strong> Timelines<br />

Based on the experience observed in the model <strong>district</strong>s, timeline <strong>of</strong> 18 months to evolve a state<br />

wide model appears to be stringent. While best efforts should be made to meet with the given<br />

timeline, the actual timeline can be assessed only while preparing the Detailed <strong>Project</strong> Report for<br />

a particular state.<br />

Context <strong>of</strong> BPR<br />

It has been indicated that BPR is one <strong>of</strong> the critical parts <strong>of</strong> the <strong>Project</strong>. However, the BPR<br />

approach is likely to vary as per specific outputs expected <strong>and</strong> the enabling factors that would<br />

drive the project. As a result, while it is appreciated that BPR will form a part <strong>of</strong> this project, the<br />

definition <strong>of</strong> BPR needs to be defined on a case to case basis.<br />

Office layout design<br />

While introducing e-<strong>district</strong> project, a conscious effort should be made to improve the <strong>of</strong>fice layout<br />

<strong>and</strong> environment. The <strong>of</strong>fice layout design <strong>of</strong> Palakkad <strong>district</strong> can serve as a reference design for<br />

e-<strong>district</strong> pilot project.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!