State Mission Mode Project e-district - Department of Electronics and ...
State Mission Mode Project e-district - Department of Electronics and ...
State Mission Mode Project e-district - Department of Electronics and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Study Report on Assessment <strong>of</strong> the <strong>Mode</strong>l e-<strong>district</strong>s<br />
Revision <strong>of</strong> Timelines<br />
Based on the experience observed in the model <strong>district</strong>s, timeline <strong>of</strong> 18 months to evolve a state<br />
wide model appears to be stringent. While best efforts should be made to meet with the given<br />
timeline, the actual timeline can be assessed only while preparing the Detailed <strong>Project</strong> Report for<br />
a particular state.<br />
Context <strong>of</strong> BPR<br />
It has been indicated that BPR is one <strong>of</strong> the critical parts <strong>of</strong> the <strong>Project</strong>. However, the BPR<br />
approach is likely to vary as per specific outputs expected <strong>and</strong> the enabling factors that would<br />
drive the project. As a result, while it is appreciated that BPR will form a part <strong>of</strong> this project, the<br />
definition <strong>of</strong> BPR needs to be defined on a case to case basis.<br />
Office layout design<br />
While introducing e-<strong>district</strong> project, a conscious effort should be made to improve the <strong>of</strong>fice layout<br />
<strong>and</strong> environment. The <strong>of</strong>fice layout design <strong>of</strong> Palakkad <strong>district</strong> can serve as a reference design for<br />
e-<strong>district</strong> pilot project.<br />
40