Study Report on Assessment <strong>of</strong> the <strong>Mode</strong>l e-<strong>district</strong>s<br />

<strong>Project</strong> • Support from the distri<br />

Management <strong>of</strong>ficials <strong>and</strong> administration<br />

7. Current Status <strong>of</strong> the <strong>Project</strong><br />

• <strong>Project</strong> Champion Mr. Umashankar had willing<br />

accepted the task <strong>of</strong> Pilot e-<strong>district</strong> <strong>and</strong> was involved<br />

the Head <strong>of</strong> Functional <strong>and</strong> administrative componen<br />

<strong>of</strong> the project.<br />

• He also created Technical team in Collectorate <strong>and</strong> w<br />

involved directly in the s<strong>of</strong>tware development.<br />

• He organized may training programmes for the citize<br />

<strong>and</strong> employees<br />

The way-forward for the Thiruvarur e-<strong>district</strong> project was implementation <strong>of</strong> the wireless<br />

technology to connect all the 7 Taluk <strong>of</strong>fices, 2 revenue divisional <strong>of</strong>fices, 10 Panchayat Union<br />

<strong>of</strong>fices with the collectorate. The concept was to convert the collectorate into a paperless<br />

environment. However it was not implemented due to lack <strong>of</strong> funds.<br />

• Due to lack <strong>of</strong> timely funds <strong>and</strong> project ownership the project progress has not been<br />

significant after year 2001. However the e-<strong>district</strong> application has been running in the<br />

Taluks for the last several years <strong>and</strong> user charges are being collected. The Taluk<br />

automation s<strong>of</strong>tware is widely used application amongst the 20 e-governance application<br />

developed. We had visited the Taluk <strong>of</strong>fice <strong>of</strong> Thiruvarur <strong>and</strong> the collector ate, some <strong>of</strong> the<br />

issues that needs to be resolved in the existing scenario<br />

• The Taluk Automation application is the main application which is in use. Other key<br />

applications such as Block Automation, Transport, <strong>and</strong> Estimator etc are not in use<br />

• Based on the discussions with the existing <strong>of</strong>ficials information technology <strong>and</strong> its use is not<br />

a current priority <strong>of</strong> the <strong>district</strong>.<br />

• S<strong>of</strong>tware was developed by an in-house application development team; all the<br />

programmers involved have left the <strong>district</strong> administration. Since NIC was not involved in<br />

the application development, it s not able to provide the s<strong>of</strong>tware troubleshooting <strong>and</strong><br />

maintenance<br />

• The Hardware installed at the Taluks <strong>and</strong> Blocks needs to be upgraded. The AMC <strong>of</strong> the<br />

hardware has been expired <strong>and</strong> hardware support is not provided at the Taluks or blocks<br />

• Absence <strong>of</strong> Diesel Genset for operating at the Taluks. Since there is shortage <strong>of</strong> electricity<br />

supply in Taluks, there is need supplement the UPD with Gensets.<br />