Study Report on Assessment <strong>of</strong> the <strong>Mode</strong>l e-<strong>district</strong>s<br />

the types <strong>of</strong> PPP <strong>Mode</strong>ls applicable in the <strong>district</strong> in context with different Scenarios,<br />

depending on the amount <strong>of</strong> investments to be made by the Private or Govt. Party.<br />

5. Maintenance/upgradation <strong>of</strong> Hardware/equipment, upgradation <strong>of</strong> the s<strong>of</strong>tware on regular<br />

basis, has to be planned <strong>and</strong> Budgeted, otherwise, systems have their natural death, sooner<br />

than expected.<br />

6. Ban on issue <strong>of</strong> manual records: Government Order (GO) from Commissioner <strong>of</strong> Revenue<br />

Administration for use <strong>of</strong> computerized receipts had also issued during the e-<strong>district</strong><br />

implementation.<br />

7. Designing a <strong>Project</strong> Plan with well defined milestones is necessary for successful e-<br />

Governance outcomes. <strong>Project</strong> plan with h<strong>and</strong>holding <strong>and</strong> maintenance support <strong>of</strong> the<br />

Application development <strong>and</strong> key activities should be designed. Currently in Thiruvarur the<br />

s<strong>of</strong>tware developers <strong>of</strong> the various applications have left without sharing the s<strong>of</strong>tware<br />

Application code or flow with any other Technical team or NIC. There is a need in the<br />

<strong>district</strong> for a Technical team to underst<strong>and</strong> the various applications ( more than 20) for<br />

enhancement <strong>and</strong> maintenance at the Taluks <strong>and</strong> blocks<br />

8. The <strong>Project</strong> Team should continue through out the life cycle <strong>of</strong> the project<br />

implementation. Systematic h<strong>and</strong>holding procedures needs to be designed in case <strong>of</strong> exit <strong>of</strong><br />

any project team member for smooth implementation <strong>of</strong> the project<br />

9. The Application should be user friendly <strong>and</strong> language interface should be bilingual for wide<br />

acceptance.<br />

10. The success <strong>of</strong> the e-District project in Thiruvarur was also due to the training <strong>of</strong> the users<br />

<strong>and</strong> mitigating all the change management issues. This should be part <strong>and</strong> parcel <strong>of</strong> the<br />

implementation strategy for converting a District into e-District. Training at all levels was<br />

provided to the users. Every VAO is updating his records at Taluk <strong>and</strong> reconciliation<br />

happens.<br />

11. The success <strong>of</strong> Thiruvarur also was dependent on an effective online grievance redressal<br />

mechanism this system enabled the capturing <strong>of</strong> the petition details online <strong>and</strong> monitoring<br />

the disposal <strong>of</strong> petitions by various Government <strong>Department</strong>s online. More than 3000<br />

applications were received <strong>and</strong> monitored every week. This helped gain acceptance <strong>of</strong> the<br />

citizens for the e-<strong>district</strong> application<br />