15.11.2012 Views

State Mission Mode Project e-district - Department of Electronics and ...

State Mission Mode Project e-district - Department of Electronics and ...

State Mission Mode Project e-district - Department of Electronics and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Study Report on Assessment <strong>of</strong> the <strong>Mode</strong>l e-<strong>district</strong>s<br />

I.3 Limitations <strong>of</strong> the Study<br />

Limitations <strong>of</strong> our study were:<br />

• No reference model was available for the study.<br />

• The information provided by the key personnel has not been validated either through<br />

observation or verification with other independent sources.<br />

• In most <strong>of</strong> the model <strong>district</strong>s the original project champions were no longer available<br />

for interaction.<br />

I.4 Structure <strong>of</strong> the Report<br />

This report consists <strong>of</strong> two main parts. The first part is a consolidated report on the assessment <strong>of</strong><br />

the model <strong>district</strong>s that has been prepared jointly by the empanelled consultants. The second part<br />

consists <strong>of</strong> detailed individual reports <strong>of</strong> the model <strong>district</strong>s. The main report also contains the<br />

summary findings <strong>of</strong> all the model <strong>district</strong>s taken up during the study, with key learnings, issues<br />

<strong>and</strong> challenges <strong>and</strong> best practices. We have also presented an evolving model <strong>and</strong><br />

recommendations for pilot e District in the main report.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!