Storm Duration<br />

Development of <strong>Project</strong>ed Intensity-Duration-Frequency Curves<br />

for Corner Brook <strong>and</strong> Goulds/Petty Harbour, Newfoundl<strong>and</strong> May 16, 2012<br />

Figure 2-2 - Historical IDF Curve, Deer Lake Station, 8401501<br />

Table 2-1 - Historical IDF Table, Deer Lake Station, 8401501, Precipitation intensities over the<br />

specified duration, mm/hr<br />

Return period (years)<br />

2 5 10 20 25 50 100<br />

5 min 47.3 69.5 84.1 98.2 102.7 116.4 130.0<br />

10 min 34.3 48.6 58.2 67.3 70.2 79.1 87.9<br />

15 min 27.9 38.3 45.1 51.7 53.8 60.2 66.6<br />

30 min 19.7 25.4 29.2 32.8 33.9 37.5 41.0<br />

1 hr 13.4 16.8 19.1 21.3 21.9 24.1 26.2<br />

2 hr 9.4 12.2 14.1 15.8 16.4 18.1 19.9<br />

6 hr 5.0 6.1 6.8 7.5 7.7 8.4 9.1<br />

12 hr 3.1 3.7 4.2 4.6 4.7 5.1 5.5<br />

24 hr 1.8 2.2 2.4 2.6 2.7 3.0 3.2<br />