18.06.2015 Views

Flood Risk and Vulnerability Analysis Project - Atlantic Climate ...

Flood Risk and Vulnerability Analysis Project - Atlantic Climate ...

Flood Risk and Vulnerability Analysis Project - Atlantic Climate ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1979<br />

1983<br />

1987<br />

1991<br />

1995<br />

1999<br />

2003<br />

2007<br />

2011<br />

2015<br />

2019<br />

2023<br />

2027<br />

2031<br />

2035<br />

2039<br />

2043<br />

2047<br />

2051<br />

2055<br />

2059<br />

2063<br />

2067<br />

2071<br />

2075<br />

2079<br />

2083<br />

2087<br />

2091<br />

2095<br />

2099<br />

Mean Annual Temperature<br />

Development of <strong>Project</strong>ed Intensity-Duration-Frequency Curves<br />

for Corner Brook <strong>and</strong> Goulds/Petty Harbour, Newfoundl<strong>and</strong> May 16, 2012<br />

of projected results is a policy decision; some additional discussion regarding the<br />

interpretation of uncertainty is provided in Section 5.3.<br />

5.0 RESULTS AND DISCUSSION<br />

5.1 GCM <strong>Project</strong>ions of Precipitation <strong>and</strong> Temperature<br />

The evolution over time of projected precipitation, temperature <strong>and</strong> the product of<br />

precipitation <strong>and</strong> temperature for all 48 projections available in the Maurer archive for<br />

Deer Lake <strong>and</strong> St. John’s A are shown as 30-year rolling mean values in Figure 5-1<br />

through Figure 5-4.<br />

10.00<br />

9.00<br />

8.00<br />

7.00<br />

6.00<br />

5.00<br />

4.00<br />

3.00<br />

2.00<br />

1.00<br />

0.00<br />

Figure 5-1 – Deer Lake Station; Evolution of <strong>Project</strong>ed Temperature<br />

Trailing 30-Year <strong>Project</strong>ed Mean Annual Temperature<br />

Deer Lake, NL<br />

Overlap<br />

Period<br />

<strong>Project</strong>ion<br />

Period<br />

Vertical bar denotes end of overlap period <strong>and</strong> beginning of projection period. Thin, colored<br />

lines represent individual projections. Black line represents mean of all projections.<br />

Year<br />

AMEC Environment & Infrastructure 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!