11.07.2015 Views

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CCTNS Functional & Technical SpecificationsSI shall provide a Bill of Material that specifies all the hardware, software and any additionalnetworking components of solution for the State Data Centre and DRC, in detail so as tofacilitate sizing of common Data Centre and DRC infrastructure such as Racks, Power andCooling, Bandwidth among other components. The common DC and DRC infrastructureshall be provided by State.SI shall ensure that effective Remote Management features exist in solution so that issues canbe addressed by the SI in a timely and effective manner; and frequent visits to Data Centre/DRC can be avoided. After commissioning and testing of the entire system at State DataCenter / DRC, the SI shall support the State in getting the system certified by a 3rd partyagency identified by State.The following common Data Centre services will be available to the SI through the DataCentre Operator / Data Centre Service Provider (DCO):1. RACK2. Power and Cooling3. UPS, DG set power backup4. Bandwidth and Connectivity5. LAN6. VPN7. Firewall8. Intrusion Protection System9. Fire Prevention10. Physical Security Surveillance11. Network Operation Centre12. Common Data Centre Facility Maintenance and Support13. Enterprise Management SystemThe SI is responsible for the below at the Data Centre / DRC, not limiting to:1. Servers (Web, Application, Database, Backup, Antivirus, EMS, Email &Messaging etc.)Assam Police Page 138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!