11.07.2015 Views

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CCTNS Functional & Technical SpecificationsService LevelDescriptionInfrastructurePerformanceMeasurementNumber of instances over the Violations for calculationsix month periodof penalty>0 & 3 2In addition to the above, if the number of instances in any month inthe six-month period exceeds 3, one (1) additional violation will beadded for each such month to the overall violations for this servicelevel.Sustained period of peak I/O utilization of any server crossing 70%(with the exception of batch processing) shall be less than or equal to30 minutes.Severity of Violation: HighEach occurrence where the peak I/O utilization of any server crosses70% (with the exception of batch processing) and stays above 70% fortime more than 30 minutes will be treated as one (1) instance.Number of instances overthe six month periodViolations for calculationof penalty>0 & 3 2In addition to the above, if the number of instances in any month inthe six-month period exceeds 3, one (1) additional violation will beadded for each such month to the overall violations for this servicelevel.Assam Police Page 208

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!