11.07.2015 Views

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

RFP VOL-I.pdf - National Crime Records Bureau

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CCTNS Functional & Technical Specifications• Proper approvals have been received from CAS CoreGroup/CTT/CPMU.The SDA will define the Software Change Management and version control process andobtain approval for the same from NCRB. For all proposed changes to the application, theSDA will prepare detailed documentation including proposed changes, impact on the systemin terms of functional outcomes/additional features added to the system, etc.Technical Program Management of Implementation of CAS (State)After successful certification, the SDA will handover the certified CAS (State) to Statethrough NCRB. While NCRB will facilitate the transfer, the successful transfer of CAS toState on time is SDA‘s responsibility. During the period of CAS Solution Design andDevelopment and the Operations and Maintenance Phase following that, the SDA shallprovide technical program management services in implementing CAS in State. Through theTechnical Program Management, the SDA shall extend all the necessary support to the StateSI and ensure that the SI successfully configures, customizes and deploys CAS (State) inStates/UTs. The SDA‘s Technical Program Management responsibilities include but are notlimited to:• Preparation of technical manuals to enable the SI to configure, customize,enhance and deploy CAS in States/UTs; to be made available to SIs through the CAS onlinerepository managed by the SDA.• Preparation of ―CAS Implementation toolkits‖ that comprehensively coversdetails on all the aspects of the CAS (State) and CAS (Centre) applications including but notlimited to technical details of CAS, configuration, customization, and extension details,infrastructure sizing details, installation, commissioning, maintenance, infrastructureenvironment turning, and performance tuning details that are required for the SI tosuccessfully commission the CAS (State) application in the State, integrate CAS (State) withexternal agencies and third party solutions in the State and integrate CAS (State) with CAS(Centre) to seamless transfer the required data to NCRB. The implementation toolkit shallalso include the following:o All completed and updated training and support material needed forcustomizing and deploying CASAssam Police Page 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!