02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 5<br />

Conservation: Prepare and implement a Dhole Conservation Plan in the proposed<br />

Project Area and the Qinling based on results of the above research<br />

program.<br />

Protection: Encourage actions to ensure that the species receives the fullest<br />

possible national and Shaanxi Province legislative protection.<br />

Capacity building: Train reserve wardens and researchers to identify Dholes and use GPS<br />

equipment to record locations of sightings, dens, tracks, and scats.<br />

Provide field study equipment including camera-traps and radiotelemetry<br />

devices for Dhole studies. Carry out public awareness<br />

campaigns to alert the public to the conservation program and elicit<br />

public support for conservation.<br />

111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!