02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 4<br />

riparian habitats in the QBCDA area. Investigate the economic potential of linking<br />

riparian management to livelihood development by creating small fishpond / wetlands<br />

for small-scale production of species endemic to the QBCDA river system 10 (e.g.<br />

Manchurian Trout) to increase and improve current riparian habitat conditions and aid<br />

species recovery.<br />

(iv) Investigations on permanent cover cropping systems for land removed from<br />

agriculture in the “Grain for Green” program to improve long term conservation<br />

measures whilst supporting livelihoods, e.g. investigations into production systems for<br />

endemic shrub and tree species for the production of medicinal herbs and oils,<br />

‘coppice with standard systems’ for the production of craft based materials,<br />

permanent cover agro-forestry systems etc.<br />

(v) Habit restoration and management of controlled release areas as a halfway step for<br />

the wild release of Giant Panda, Crested Ibis etc. Monitoring and scientific research<br />

focused on information requirements for designing a controlled or wild release<br />

program (habitat restoration and management, animal behavior patterns etc)<br />

10<br />

This project could be linked to the river system water management improvements and management of the<br />

hydro electric stations in the QBCDA area<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!