TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 16<br />

F. Compensation Standard for Land Acquisition and Resettlement Plan in the<br />

Implementing Area<br />

1. Policies and Principles<br />

15. In accordance with legal regulations concerning land acquisition and relocation by the national<br />

and local governments and guiding principles of ADB concerning relocation and resettlement, and<br />

especially in order to carry out the construction of the Project, the Project shall be implemented in<br />

adherence to improving or not lowering the production conditions and living standard of the affected<br />

people. The affected residents are entitled to get compensations from the implementation party that<br />

should help the affected residents to resume or improve the level of their income and life. In conformity<br />

to the above principles, the Foreign Loan Office of Shaanxi Province, the executing unit, and Mt.<br />

Qinling Botanic Garden of Shaanxi, the implementing unit, together with Shaanxi Provincial<br />

Department of Land Resources and other related departments, draw out relative policies and<br />

measures in respect of the Project as per the guidance and requirements of Decision on Furthering<br />

Reform of Land Management of the State Council (Guofa [2004] No.28) and Notice on Printing the<br />

Suggestions for Completing Compensation and Relocation System of Land Expropriation (Guotuzifa<br />

[2004] No. 238) by the Ministry of Land Resources.<br />

(i) Compensation shall be made in accordance with the actual condition of the<br />

demolished houses, regardless of their ownerships, in order to ensure that the<br />

demolished households can obtain the houses of the same structure and areas as<br />

their demolished ones stipulated in RAP. According to the guide for house relocation<br />

settlement and the structure and type of houses, the people affected by demolishment<br />

shall be compensated directly, and their previous houses shall not be depreciated;<br />

besides, the affected residents are entitled to the construction materials of their<br />

previous house.<br />

(ii) For villagers who lose their houses, the village and township government shall allocate<br />

land bases for them to build houses by themselves with the assistance of<br />

compensation fees and house removal fees; or they can ask the village and township<br />

government to build the house. No matter which way of rebuilding is adopted, the<br />

house cannot be demolished until the demolished households have removed to their<br />

new houses.<br />

16. In accordance with the assessment and approval of the real estate management bureaus of<br />

the county or the city, the compensation standard is as shown in Table 4 below.<br />

Unit: CNY/m 2<br />

Type Brick and<br />

Concrete<br />

(m 2 )<br />

Table 4: Housing Compensation Standards<br />

Brick and<br />

Wood (m 2 )<br />

Earth and<br />

Wood (m 2 )<br />

Simple (m 2 )<br />

Standard 520 450 350 150<br />

17. As to the illegal temporary constructions, only appropriate sum of removal fee shall be granted<br />

for timely demolition.<br />

2. Affected Land Compensation Standard<br />

18. Standard for land compensation fee and relocation subsidy – In line with the spirit and<br />

requirement of the Decision on Furthering Reform of Land Management of the State Council and the<br />

Notice on Printing the Suggestions for Completing Compensation and Relocation System of Land<br />

Expropriation (Guotuzifa [2004] No. 238) released by the Ministry of Land and Resources, land<br />

compensation fee and relocation subsidy shall be calculated according to the legal maximum of the<br />

summation of both land compensation fee and relocation subsidy, namely, totally 30 times of the<br />

average output of the land within the project area in the first three years since the land is expropriated.<br />

The young crops compensation shall be calculated according to the maximum of 40% to 90% of the<br />

average output of the land with damaged young crops in the first three years. Compensation for<br />

orchard, residential base and barren land shall be calculated according to the Implementation of ‘Land<br />

5