02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tracking Tool for GEF Biodiversity Focal Area Strategic Priority Two:<br />

Mainstreaming Biodiversity in Production Landscapes/Seascapes and Sectors<br />

TA 4721–PRC: Preparing the ShaanxiI–Qinling Mountains Integrated Ecosystem Management Project<br />

Qinling<br />

Issue Criteria<br />

Qinling Comments Next steps<br />

Score<br />

The boundary of the protected area is known by the<br />

management authority and local residents and is<br />

appropriately demarcated<br />

3<br />

Is the boundary<br />

known and<br />

demarcated?<br />

Draft or update management,<br />

and recovery plans for all<br />

reserves;<br />

Integrate management of adja<br />

reserves to enable them to<br />

in concert.<br />

Include quantifiable conserva<br />

Management plans were prepared for 5<br />

reserves by World <strong>Bank</strong> GEF<br />

project;<br />

Other reserves need assistance to<br />

develop and implement plans.<br />

Older plans need to be updated and<br />

expanded to include conservation<br />

There is no management plan for the protected area<br />

Context<br />

7. Management plan<br />

0<br />

1<br />

2<br />

A management plan is being prepared or has been<br />

prepared but is not being implemented<br />

An approved management plan exists but it is only<br />

being partially implemented because of funding<br />

constraints or other problems<br />

Is there a<br />

management plan<br />

and is it being<br />

implemented?<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!