02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 10<br />

PROJECT COSTS<br />

China<br />

Shaanxi Qinling Mountains Integrated Ecosystem Management Project<br />

Expenditure Accounts Project Cost Summary (Local Ten Thousand) (US$ '000)<br />

Local Foreign Total Local Foreign Total<br />

I. Investment Costs<br />

A. Civil Works<br />

Construction 19,396.2 2,155.1 21,551.4 25,521.4 2,835.7 28,357.1<br />

Planting 3,075.8 341.8 3,417.6 4,047.2 449.7 4,496.8<br />

Infrastructure 12,665.5 1,407.3 14,072.8 16,665.1 1,851.7 18,516.8<br />

Landscaping 8,324.3 924.9 9,249.2 10,953.0 1,217.0 12,170.0<br />

Subtotal Civil Works 43,461.9 4,829.1 48,291.0 57,186.7 6,354.1 63,540.7<br />

B. Equipment<br />

Equipment - Machinery 2,179.9 726.6 2,906.6 2,868.3 956.1 3,824.4<br />

Equipment - Outfitting 428.2 142.7 570.9 563.4 187.8 751.2<br />

Other Equipment 2,146.4 238.5 2,384.9 2,824.2 313.8 3,138.0<br />

Office Equipment 1,311.0 145.7 1,456.7 1,725.0 191.7 1,916.7<br />

Equipment-Furniture 256.0 - 256.0 336.8 - 336.8<br />

Subtotal Equipment 6,321.4 1,253.5 7,575.0 8,317.7 1,649.4 9,967.0<br />

C. Vehicles<br />

Cars & Trucks 364.0 121.3 485.3 478.9 159.6 638.6<br />

D. Materials<br />

Planting Material & Supplies 3,427.8 - 3,427.8 4,510.3 - 4,510.3<br />

Office Materials & Supplies 389.5 - 389.5 512.5 - 512.5<br />

Subtotal Materials 3,817.3 - 3,817.3 5,022.8 - 5,022.8<br />

E. Training<br />

Technical Training (AGENCIES) 49.9 - 49.9 65.7 - 65.7<br />

Stakeholder Technical Training 158.0 - 158.0 207.9 - 207.9<br />

Vocational Training 91.5 - 91.5 120.4 - 120.4<br />

Community Training & Extension 200.0 - 200.0 263.2 - 263.2<br />

Demonstrations 482.6 - 482.6 635.0 - 635.0<br />

Subtotal Training 982.0 - 982.0 1,292.1 - 1,292.1<br />

F. Surveys & Studies<br />

Planning 310.0 - 310.0 407.9 - 407.9<br />

Monitoring & Evaluation 195.5 - 195.5 257.2 - 257.2<br />

Field Technical Surveys & Trials 1,949.4 - 1,949.4 2,565.0 - 2,565.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!