02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8<br />

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 16<br />

demolition, appropriate sum of subsidy shall be provided. The maximum duration for payment of<br />

transition fees shall not exceed the production restoration period.<br />

G. Land Compensation and Dividend for the Voluntarily Pooled Land within the Project<br />

Area<br />

29. The Project will utilize 4,039.5 mu of land area, of which 293.63 mu of land will be<br />

expropriated, and the rest part of land, totally 3,745.87 mu, shall be utilized by the peasants within the<br />

project area through voluntarily buying shares. The land utilization and compensation of this area<br />

includes two aspects: the compensation for ground attachment and young crops of the pooled land;<br />

and the policy on dividend for the pooled land. The standard for the former two items shall comply with<br />

the relevant requirements of the national policy and ADB (Asia <strong>Development</strong> <strong>Bank</strong>).<br />

1. Compensation and payment for the ground attachment and young crops of the<br />

pooled land within the project area<br />

30. According to the research report on The Project of Land Expropriation, Relocation and<br />

Conservation of Mt. Qinling National Botanical Garden, it is preliminarily confirmed that the pooled<br />

land is 3,745.87 mu, of which the irrigable land and dry land take up 1,186.07 mu, and hillside land<br />

2,559.8 mu. The compensation standard for the ground attachment and young crops of the pooled<br />

land shall conform to that of the expropriated land of the Project.<br />

31. The pooled land shall not change its nature for agricultural use, thus all kinds of specialized<br />

facilities on the ground of the pooled land for hydraulic work, power, communication, as well as yard,<br />

vault storeroom shall not be ravaged or relocated. If compensation is necessary in the Project, it shall<br />

be fulfilled in accordance with the relevant regulations of the Shaanxi Provincial People’s Government<br />

and the real construction cost, or the alternative price.<br />

32. The compensation and payment for the ground attachment and young crops of the pooled<br />

land shall be fulfilled a month earlier prior to the implementation of the Project.<br />

33. Consultation, complaints, appeal, public participation, supervision and assessment procedure<br />

and method concerning the above-mentioned compensation standard and payment shall be in<br />

conformity with that of the expropriated land of the Project.<br />

2. Profit-sharing<br />

34. According to settlement policy on pooling of land in Instruction on Consummation of Land<br />

Appropriation Compensation System by the Ministry of Land and Resources (Guotuzifa�2004�<br />

No.238), the Project shall acquire land-use right of 3,745.87 mu by the way that farmers are<br />

shareholders with free will. Besides compensation of ground attachment and green seedling of<br />

appropriated land, the original land user shall share profit. In order to protect the interest of the original<br />

user on the appropriated land, profit sharing of the original land user shall be counted by fixed profit<br />

sharing and revenue profit sharing.<br />

35. The fixed profit sharing standard is CNY500 for irrigable land, CNY400 for dry land and<br />

CNY300 for sloping land at the first year. Since the second year, sharing of each category shall be<br />

elevated CNY20 per year.<br />

36. From the year Mt. Qinling National Botanical Garden gains admission income, the original land<br />

user shall enjoy operation profit sharing and the fixed profit sharing will not ascend.<br />

37. Operation profit sharing enjoyed by the original land user is admission dividend, with the<br />

standard of CNY7,500/mu for sloping land, CNY10,000/mu for dry land and irrigable land of<br />

CNY12,500/mu with land-use right of 50 years to be paid for shares. Decide ticket division proportion<br />

to be a percentage, according to the land investment proportion on the total capital stock of the<br />

Garden.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!