TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 7<br />

� A report should be produced on year two to summarize results of the fund raising<br />

approach used by Public Benefit Funds inside China and other environmental funds<br />

world-wide.<br />

� A report should be produced on year four of the project to recommend the<br />

replenishment system used by the Eco-fund. The report should include :<br />

� Summary of the fund raising system recommended to maintain / increase the Ecofund’s<br />

capital size to achieve its objectives in the broader Qinling area. A set of<br />

methods should be included such as annual appeal workshop inviting all the tourism<br />

operators in the Qinling area.<br />

� Legal status of the recommended fund raising activities<br />

� Operation procedure and guidelines<br />

358. The term of sub-contract will be for three years from year one of the project implementation.<br />

Inputs in each year will be three month. Total budget will be CNY696,000.<br />

b. Training and Capacity Building<br />

359. The overall training program is incorporated within each Project subcomponent so that each<br />

Implementing Agency or enterprise is clear in what is proposed. In addition, to the proposed training<br />

the PPTA has proposed an institutional strengthening program be supported by ADB through<br />

additional technical assistance grant funding.<br />

360. The TA will support the strengthening of the QNBG which will be newly formed prior to loan<br />

effectiveness. The strengthening program is described in Table 23 and seeks to develop the internal<br />

capacity of QNBG to operate in a commercially efficiency manner. A final plan will need to be<br />

prepared once final staffing and structural issues are agreed. At the Time of the PPTA <strong>Final</strong> <strong>Report</strong><br />

the SPG was seeking to form QNBG in the first year of the Project while ADB had rejected the<br />

organizational proposal. During loan fact finding ADB changed its position to one of supporting the<br />

proposed institutional reforms and requested its inclusion. A final institutional strengthening program<br />

needs to be designed based on the staff included, the structural and management responsibilities and<br />

authorities created. These remain undecided.<br />

361. The proposed Institutional strengthening approach is based on developing agreed<br />

responsibilities, job descriptions, operational procedures through corporate strategy and work planning<br />

development and then using a work planning model to implement these strategies. The Project will<br />

facilitate the necessary processes for deciding on these and then support through training the building<br />

of capacity for QNBG to undertake and implement the agreed plans. In this respect the majority of<br />

institutional strengthening is achieved through facilitated guidance and leadership development that<br />

can then use the training programs and planning systems within the Project design to build the<br />

implementation capacity. The institutional strengthening ADTA is therefore targeted at the<br />

Management of QNBG and the Divisional Directors. The TA will assist the SPG in providing the<br />

following outputs:<br />

� SBP corporate manual and operational procedures<br />

� Governance structures<br />

� Financial systems and reporting capacity<br />

� Information systems and MIS<br />

� HRD development plan<br />

� Business Group Plans and annual work programs<br />

� <strong>Report</strong>ing and management information<br />

� Commercial procedures and quality controls<br />

362. The overall training and institutional investment is summarized in Table 23 below. The<br />

inability to confirm additional TA grant funding is however a major weakness ion the Project Design as<br />

without the institutional strengthening program the PPTA considers the Project not to be feasible due<br />

to implementation capacity constraints.<br />

63