TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management<br />

Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 15<br />

ANNEX I: ENVIRONMENTAL SUPERVISION AND ENFORCEMENT<br />

Pre-<br />

Construction<br />

Phase<br />

Construction<br />

Phase<br />

Operation<br />

Phase<br />

Key<br />

Responsibilities<br />

Confirm the environmental standards and<br />

emission standards applied to the project<br />

Review and approve the environmental<br />

impact assessment report<br />

Review and approve the environmental<br />

management and monitoring plan<br />

Review the preliminary design for<br />

environmental protection facilities in the<br />

project (three simultaneousness)<br />

Review and confirm environmental<br />

investment<br />

Review site-specific environmental<br />

management plan and work plan with site<br />

supervisors<br />

Make sure all required mitigation<br />

measures are in place<br />

Ensure the sites for storage and<br />

preparation are appropriately located<br />

Document inspection findings<br />

Recommend improved mitigation<br />

measures as necessary<br />

Suspend work if adverse impact are noted<br />

The key areas should include:<br />

earthmoving, hydrological modification,<br />

wastewater discharge, construction noise,<br />

dust, and solid waste<br />

Make sure the sites are restored timely<br />

Ensure the environmental facilities are<br />

completed (three simultaneousness)<br />

Review the environmental and<br />

management plan<br />

Review the environmental monitoring plan<br />

Ensure the environmental facilities are<br />

functional and in operation(three<br />

simultaneousness)<br />

Ensure the sensitive environmental<br />

elements are protected<br />

Update environmental management and<br />

monitoring plan<br />

Supervision<br />

Agency<br />

11<br />

Schedule for<br />

Environmental<br />

Supervision<br />

SEPB As needed<br />

XEPB/PMO/EMUs<br />

XEPB/PMO/EMUs<br />

SEPB<br />

Before work<br />

commences<br />

Weekly<br />

Twice a year<br />

XEPB/EMU Quarterly<br />

SEPB =SHAANXI ENVIRONMENT PROTECTION BUREAU; XEPB =XIAN ENVIRONMENT<br />

PROTECTION BUREAU; EMU =ENVIRONMENTAL MANAGEMENT UNIT; PMO =PROJECT<br />

MANAGEMENT OFFICE ON BEHALF OF PDRC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!