TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 16<br />

3. Other Affected Facilities<br />

21. After the assessment of the relevant authorities, compensation fee for the affected auxiliary<br />

facilities shall be fulfilled according to alternative prices of the facilities. See Table 8 below for the<br />

compensation standard.<br />

Scattered Fruit<br />

Trees (No.)<br />

Unit: CNY<br />

Table 8: Affiliated Facilities Compensation Standard<br />

Young Fruit<br />

Trees (No.)<br />

Useful Woods<br />

(No.)<br />

Useless Woods<br />

(No.)<br />

Brick<br />

Enclosure (m)<br />

7<br />

Earth<br />

Enclosure (m)<br />

60-80 5 10-20 5-10 40-80 10-40<br />

22. All specialized facilities, including facilities for hydraulic work, power and communication, as<br />

well as yards, pools and vault storeroom, shall be compensated according to relevant regulations of<br />

Shaanxi Provincial People’s Government and their real construction cost or alternative value.<br />

4. Evaluation of the Compensation Standard<br />

23. According to the spirit and requirement of the Decision on Furthering Reform of Land<br />

Management of the State Council (Guofa [2004] No. 28) and the Notice on Printing the Suggestions<br />

for Completing Compensation and Relocation System of Land Expropriation (Guotuzifa [2004] No.<br />

238) released by the Ministry of Land and Resources, the compensation standards for houses,<br />

affected land and young crops of this Project are proposed by Shaanxi Foreign Loan Office, namely<br />

the executing agent and the implementation agent of the Project along with Shaanxi Provincial<br />

Department of Land Resources and Shaanxi Provincial Bureau of Statistics, in the light of the social<br />

and economic development strength and features within the Project area of Shaanxi province,<br />

incorporating the part of suggestions put forward by every districts when they enact the uniform<br />

standard for annual output. Therefore, these standards are lifted by a large margin compared with the<br />

previous ones. The compensation standard for land and young crops of the Project has been<br />

stipulated with incorporation of the suggestions of the local government and residents, so it is highly<br />

rated by the local government and residents according to the feedbacks.<br />

5. Payment of Compensation Fee<br />

24. Compensation fee for land expropriation takes a part in the total investment of the Project,<br />

thus it has already been considered in the budgetary estimation. All the compensation fees are<br />

allocated by Shaanxi Foreign Loan Office; they shall be given to the affected collectivities and people,<br />

and no one shall intercept or embezzle them: land expropriator shall sign contract with the previous<br />

owner of the expropriated land; the compensation fee shall be drawn with the signature of the payee;<br />

and all the materials shall be kept in archives.<br />

25. Land compensation fee belongs to rural collective economic group, thus it shall be given<br />

directly to the village committee in a bid to develop production and restore the economic strength of<br />

the affected people. The affected people are entitled to discuss and participate in the economic<br />

restoration plan.<br />

26. Compensation fee for house, specialized facilities and auxiliary facilities, as well as young<br />

crops shall be directly paid to the entitled people.<br />

6. Demolition Subsidy<br />

27. The affected people shall be paid the demolition subsidy in addition to the house<br />

compensation fee according to the standards, including transition fees and the standard house<br />

removal fee of CNY500 to every household.<br />

28. If the land expropriation and relocation institution of the Project provides the temporary house<br />

for transition or demolishes the house after the new house has already been built up, the subsidy for<br />

transition shall not be covered. If houses for the production and business operation are suspended by