02.12.2012 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Strategic Objectives<br />

and<br />

Indicative Priority<br />

Activities<br />

A: Building capacity<br />

for the implementation<br />

of the Cartagena<br />

Protocol on Biosafety<br />

B: Prevention, control<br />

and management of<br />

invasive alien species<br />

GEF Biodiversity, Priority<br />

Outcomes<br />

a) strengthening the policy<br />

and<br />

institutional environment;<br />

b) prevention using an<br />

ecosystem approach; c)<br />

appropriate risk<br />

analysis procedures;<br />

d)early detection and rapid<br />

response<br />

e) managing priority alien<br />

species<br />

Invasions<br />

in pilot sites to ensure<br />

conservation and sustainable<br />

use of biodiversity.<br />

BD Strategic Objective 4: Build Capacity on Access and Benefit Sharing<br />

A: Information<br />

systems and access to<br />

up to date information<br />

B: Capacity building<br />

through exchange of<br />

information and<br />

lessons – regionally<br />

and locally<br />

C: Demonstration of<br />

new approaches for<br />

replication<br />

Outcome 1: Design and<br />

implementation build on<br />

good practice<br />

Outcome 3: Countries<br />

effectively formulate Access<br />

and Benefit Sharing<br />

mechanisms that facilitate<br />

the implementation of the<br />

Bonn Guidelines<br />

Proposed GEF<br />

Project Activities<br />

A: Legal reforms for managing natural forests and the provision of financing<br />

B: Management of habitats that have been modified due to the introduction of<br />

two alien species into the Qinling Mountains to develop improved natural<br />

forest landscapes<br />

A: Design. Builds on OP12 land degradation strategy and the 11 th five year<br />

plan for linking tourism to conservation and sustainable land management<br />

B: Implementation. Horizontal coordination through multi-sector coordination<br />

committee. Support for involvement of WWF /SFB monitoring program within<br />

the Qinling Mountains in the Project Area and endangered species<br />

management plan.<br />

User based monitoring/evaluation linked to the information service. Education<br />

and awareness strategies extended lessons learned throughout the wider<br />

Qinling Mountains.<br />

Technical training through international secondments, research contracts and<br />

habitat monitoring<br />

Demonstration of habitat and endangered species management programs,<br />

landscape planning and integrated tourism and conservation spatial plans.<br />

Workshops and Qinling Mountains symposia to share lessons learned and<br />

work within the Project Area as a field conservation experimental plot.<br />

<strong>Development</strong> and incorporation of conservation data sets for biodiversity and<br />

habitat management across the Qinling Mountains.<br />

A: Legal and policy reforms.<br />

B: Sustainable financing through revenue transfer from commercial enterprises<br />

for in-situ conservation programs<br />

C: Information sharing was a condition for lending. Wetland management.<br />

D: Ecological and spatial management zones regulated.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!