6<br />

TA 4721-PRC: Preparing the Shaanxi-Qinling Mountains Integrated Ecosystem Management Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 1<br />

Design<br />

Performance Targets Data Sources/<strong>Report</strong>ing<br />

Summary<br />

Mechanism<br />

resources demonstrated, replicated and supported through effective project<br />

management<br />

3.1 Project Management Operational<br />

Activity (20) Establish and staff PMO by end of first six months of Project; before Loan<br />

effectiveness with work plans, procurement plans and training plans agreed<br />

Activity (21) Professional Job Exchanges (13)<br />

Activity (22) Contracting of Project BME by 2008, 2010, 2012<br />

Activity (23) Contracting of resettlement monitoring by end of 2020; before loan<br />

effectiveness<br />

3.2 Institutional Strengthening<br />

Activity (24) Complete Legal review studies by 2011<br />

3.3 Conservation replication<br />

Activity (25) Complete the preparation of a Project Area Master plan by developing and<br />

applying a landscape planning model by 2011<br />

Activity (26) Establish a Conservation monitoring center for the Project Area with SFB by<br />

2008, and design, implement and evaluate a conservation monitoring program as part of a<br />

QM wide capacity building and awareness program by 2010<br />

Activity (27) Develop and implement a Communication and awareness program for<br />

disseminating the Projects lessons by 2009<br />

Assumptions<br />

and Risks