13<br />

ADB TA 4271 Shaanxi Qinling Biodiversity Conservation and Demonstration Project<br />

<strong>Final</strong> <strong>Report</strong> Appendix 19<br />

� Present a specially tailored workshop for PDRC and the Shaanxi Forest Department<br />

into the techniques they can use to appraise the quality of strategic plans submitted<br />

covering the commercial, scientific, biodiversity conservation and livelihoods groups<br />

funded under the project,<br />

� Present detailed strategic planning workshops that can be used as the basis for<br />

developing specific strategies for each of the institutions included in the TA<br />

� Include guidance on how to consider associated resource requirements at the time<br />

that such strategies are developed<br />

� Ensure that agreed strategies are reflected in any bidding documents for operation of<br />

commercial functions for the botanic gardens, the animal rescue centre and the hot<br />

springs facilities<br />

� In association with the Marketing Specialist, prepare criteria to evaluate marketing<br />

proposals submitted to the institutions’ with commercial interests<br />

� Work with Shaanxi Forest Department to ensure that all other institutions having an<br />

interest in ecosystems management and biodiversity conservation and livelihoods<br />

improvement are consulted and have the opportunity to contribute to proposed<br />

strategic goals and strategies, and that there is full alignment between all stakeholders<br />

� Develop an approach for later mainstreaming and replication of project successes<br />

� Prepare a medium term strategic plan for (i) the establishment phase of two years and<br />

(ii) the ongoing operational phase of the preferred option. The strategic plans shall<br />

include (i) Corporate level plans, (ii) business group plans<br />

� Provide capacity building to all staff in the QNBG to implement planning procedures<br />

through mentoring and facilitating each business group and also for senior<br />

management<br />

� Prepare planning procedural documentation for including into the corporate procedural<br />

manual including reporting against planned programs and the procedures under which<br />

plans are updated or revised.<br />

2. National Training Specialist<br />

3. The Consultant shall have experience in undertaking both training needs assessments and the<br />

preparation and coordination of training plans for donor funded projects. The consultant shall<br />

undertake the following:<br />

� Review the final QNBG institution and its staffing, staff qualifications and experience at<br />

all levels<br />

� Working with the QNBG HRD manager prepare in a participatory manner a training<br />

needs assessment and report this to the PMO and management of QNBG<br />

� Identify potential training providers and assess their capacity, availability of courses<br />

and timing<br />

� Identify the need for a training of trainers programs, if necessary develop using the<br />

Technical assistance resource in the Project<br />

� Prepare a training and HRD plan for QNBG and provide awareness and training with<br />

management and operational directors. The training programs may be developed by<br />

Technical assistance including the preparation of training materials<br />

� Ensure the training plan includes a program for institutionalizing the training into<br />

existing training providers and university programs.<br />

3. National Organizational Specialist<br />

4. The candidate shall have worked in the public and private sector on organizational reform<br />

and restructuring and shall have a proven knowledge of State Owned Enterprise reforms and<br />

establishment in China<br />

5. The Consultant be responsible for:<br />

� Review existing governance and performance management systems and procedures<br />

in use within the institutions involved in detailed project implementation and<br />

governance, and obtain agreement on where improvements are required